WELL · 42-451-31393 · DISTRICT 7

Lee G #2

Plugged

Tom Green County · FWB (Canyon Sand-Middle) field  · Vertical

Lee G #2 (API 42-451-31393) is a plugged well in Tom Green County, plugged January 31, 2011, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued February 29, 1984, permitted to 4,750 ft.

Completion filings report 4 formation tops, including Palo Pinto, Canyon, Capps, Strawn.

Its lease has reported 5.54K barrels of oil and 3.41K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

TXO Production Corp.

Dallas, TX · P-5 Y, filed Sep 1, 1992 · 3,227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsPioneer Exploration, LLCthrough Mar 2010
Latest permitTXO Production Corp.Feb 29, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,750
total depth, ft
1
permits on file
Feb 29, 1984
last permit issued
May 9, 1984
completed
5.54K
cumulative oil, bbl
3.41K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 9, 1984
Shut in
—
Plugged
Jan 31, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lee "G" O-9-12004FWB (Canyon Sand)Atlas Operating LLC25.54K3.41KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Moore, John D.Jan 1993 → Nov 1994
  2. 2Jaco Oil & Gas Co.Dec 1994 → Mar 1998
  3. 3Pioneer Exploration CompanyApr 1998 → Jun 2001
  4. 4Pioneer Exploration, Ltd.Jul 2001 → May 2006
  5. 5Pioneer Exploration, LLCOct 2009 → Jan 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
231034-99DrillTXO Production Corp.Feb 29, 1984Feb 29, 1984Mar 27, 19844,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-12004————

Formation tops

As filed on W-2/G-1. Subsea from 1,923 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto3,689-1,766
CanyonCANYON SAND4,140-2,217
Capps4,400-2,477
Strawn4,466-2,543

Perforations

Perforated and open-hole intervals.

FromToType
4,1424,150Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526011200 sx
4.54,5607.8751,000 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 17, 1986May 31, 1984—
00Jun 19, 1984May 31, 1984—
00Jun 8, 1984May 31, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

28.3K
bbl, last 12 reported months
28.3K
bbl, all reported
Jan 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000084916H-1 InjectionPlugged Feb 28, 20116006002,610–4,150

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 28,337

05K10K1997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131393, documented in the API reference.