TEXAS · WELLS · TOM GREEN COUNTY · JONES, E. D. "A" LEASE · API 42-451-31531 · DISTRICT 6E

Jones E. D. A #4

Shut in

Tom Green County · Atkinson W. (San Angelo) field · NO Production  · Vertical

Jones E. D. A #4 (API 42-451-31531) is a well in Tom Green County operated by Tcs Petroleum CO. LLC, completed February 15, 1985 and listed as no production on the RRC schedule, shut in January 1, 2026.

The RRC has issued one drilling permit, issued December 21, 1984, permitted to 1,108 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Tcs Petroleum CO. LLC on the wellbore schedule.

Completion filings report 2 formation tops, including San Angelo, Clear Fork.

Its lease has reported 196K barrels of oil and 38 mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 20 wells, so these are lease totals, not this well alone.

Operator of record

TCS Petroleum Co. LLC

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Based in
Abilene, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 18, 2026
Permits on file
11
Phone
(325) 338-2991

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTCS Petroleum Co. LLC
Production reportsCore Petro, LLCthrough Apr 2026
Latest permitGulf Oil Corp.Dec 21, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,108
total depth, ft
1
permits on file
Dec 21, 1984
last permit issued
Feb 15, 1985
completed
196K
cumulative oil, bbl
38
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 15, 1985
Shut in
Jan 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jones, E. D. "A" O-9-11012Atkinson, W. (San Angelo)Core Petro, LLC20196K38Jan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 953 · prior 12 1,830(-48%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lawrence, C. F. & Assoc. Inc.Jan 1993 → Jul 1994
  2. 2Earnest Producing CorporationAug 1994 → Feb 1996
  3. 3Armor Petroleum, Inc.Mar 1996 → May 2021
  4. 4Core Petro, LLCJun 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
262010-99DrillGulf Oil Corp.Dec 20, 1984Dec 21, 1984Jan 30, 19851,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 15, 1985Jones E. D. A O-9-11012Atkinson W. (San Angelo)TCS Petroleum Co. LLCNO Production · shut in Jan 1, 20261,108

Formation tops

As filed on W-2/G-1. Subsea from 2,845 ft elevation.Download CSV →

FormationMD ftSubsea
San Angelo7802,065
Clear ForkCLEARFORK1,0061,839

Perforations

Perforated and open-hole intervals.

FromToType
830884Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526511150 S
5.51,1087.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 4, 1985Mar 28, 1985—
00Apr 3, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131531, documented in the API reference.