TEXAS · WELLS · TOM GREEN COUNTY · API 42-451-31552 · DISTRICT 6E

Bryant B #3

Plugged

Tom Green County · ZLG (Palo Pinto) field  · Vertical

Bryant B #3 (API 42-451-31552) is a plugged well in Tom Green County, plugged December 1, 1987, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued February 20, 1985, permitted to 7,400 ft.

Completion filings report 3 formation tops, including Clear Fork, Cisco, Palo Pinto.

Operator of record

TXO Production Corp.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 2, 1990
Permits on file
3,227
Phone
(214) 954-2086

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsnone
Latest permitTXO Production Corp.Feb 20, 1985
7,400
total depth, ft
1
permits on file
Feb 20, 1985
last permit issued
May 3, 1985
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

On this page3 formation tops

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 3, 1985
Shut in
—
Plugged
Dec 1, 1987

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Wells named Bryant B

TXO Production Corp.'s other wells filed under this lease name in Tom Green County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
267301-99DrillTXO Production Corp.Apr 4, 1985Feb 20, 1985Mar 18, 19857,400

Completions

CompletedLeaseFieldOperatorStatusDepth
May 3, 1985Bryant B O-9-11395ZLG (Palo Pinto)TXO Production Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,053 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK1,533520
Cisco4,580-2,527
Palo Pinto6,250-4,197

Perforations

Perforated and open-hole intervals.

FromToType
6,2746,321Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62597212.25700 S
4.57,0857.8751,300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jun 17, 1985May 20, 1985—
00Jun 14, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131552, documented in the API reference.