WELL · 42-451-31565 · DISTRICT 7
Tweedy #2
Tom Green County · Vertical
Tweedy #2 (API 42-451-31565) is a permitted well in Tom Green County filed by Verdad Oil & Gas Corporation; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1985 and 1991, permitted to 6,400 ft.
Completion filings report 5 formation tops, including San Angelo, Clear Fork, Wolfcamp, Cisco.
Operator of record
Dallas, TX · P-5 Y, filed Mar 4, 2026 · 86 permits on file · (214) 356-8677
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Verdad Oil & Gas CorporationOct 23, 1991 |
- 6,400
- total depth, ft
- 2
- permits on file
- Oct 23, 1991
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-9-11825 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 392978-99 | Recompletion | Verdad Oil & Gas Corporation | Oct 17, 1991 | Oct 23, 1991 | — | 6,250 |
| 269933-99 | Drill | Verdad Oil & Gas Corporation | Mar 11, 1985 | Mar 20, 1985 | Mar 21, 1985 | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-11825 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,158 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Angelo | 830 | 1,328 |
| Clear ForkCLEARFORK | 1,997 | 161 |
| Wolfcamp | 3,688 | -1,530 |
| Cisco | 5,125 | -2,967 |
| Canyon | 6,026 | -3,868 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,125 | 5,357 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.375 | 639 | 11 | 415 S |
| 4.5 | 5,480 | 7.875 | 620 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 24, 1986 | Mar 6, 1986 | — |
| 00 | Mar 19, 1986 | — | — |
| 00 | Dec 16, 1985 | Dec 2, 1985 | Yes |
| 00 | Dec 12, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-31565 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-31565 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45131565, documented in the API reference.