WELL · 42-451-31621 · DISTRICT 7

Halfmann #1

Plugged

Tom Green County · FWB (Canyon Sand-Middle) field  · Vertical

Halfmann #1 (API 42-451-31621) is a plugged well in Tom Green County, plugged January 25, 1995, last operated by Txo Production Corp..

The RRC has issued one drilling permit, issued August 23, 1985, permitted to 4,450 ft.

Completion filings report 4 formation tops, including Base Of Colemen Junction, Palo Pinto, Yankee Sand, Canyon.

Its lease has reported 524 barrels of oil and 22 mcf of gas since January 1993, last reporting in March 1995.

Operator of record

TXO Production Corp.

Dallas, TX · P-5 Y, filed Sep 1, 1992 · 3,227 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTXO Production Corp.
Production reportsLittlepage, Tommythrough Nov 1994
Latest permitTXO Production Corp.Aug 23, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,450
total depth, ft
1
permits on file
Aug 23, 1985
last permit issued
Nov 15, 1985
completed
524
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 15, 1985
Shut in
—
Plugged
Jan 25, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Halfmann O-9-12024FWB (Canyon Sand)Littlepage, Tommy152422Jan 1993 – Mar 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Littlepage, TommyJan 1993 → Nov 1994

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
283228-99DrillTXO Production Corp.Aug 23, 1985Aug 23, 1985Oct 5, 19854,450

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-12024————

Formation tops

As filed on W-2/G-1. Subsea from 1,947 ft elevation.Download CSV →

FormationMD ftSubsea
Base of Colemen Junction2,330-383
Palo PintoBASE OF PALO PINTO3,925-1,978
Yankee Sand4,036-2,089
CanyonCANYON SAND4,130-2,183

Perforations

Perforated and open-hole intervals.

FromToType
4,1544,168Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62537012.25250 S
4.54,2507.8751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 6, 1986——
00Jan 6, 1986Dec 18, 1985Yes
00Jan 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45131621, documented in the API reference.