WELL · 42-451-32193 · DISTRICT 8

Pfluger A #4814

N

Tom Green County  · Vertical

Pfluger A #4814 (API 42-451-32193) is a permitted well in Tom Green County filed by Pure Resources, L.P.; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1992 and 2001, permitted to 9,300 ft.

Completion filings report 3 formation tops, including Dean, Wolfcamp, Canyon.

Its 3 leases have reported 1.54M barrels of oil and 18.6M mcf of gas since January 1993, last reporting in July 2026. The leases carry 174 wells, so these are lease totals, not this well alone.

Operator of record

Pure Resources, L.P.

Midland, TX · P-5 Y, filed Feb 8, 2008 · 627 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsP1 Energy, LLCthrough Mar 2026
Latest permitPure Resources, L.P.Jul 26, 2001
9,300
total depth, ft
4
permits on file
Jul 26, 2001
last permit issued
—
completed
1.54M
cumulative oil, bbl
18.6M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 174 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pfluger -A- O-10-54434Spraberry (Trend Area)P1 Energy, LLC6325.4K573KOct 2019 – Jul 2026
Pfluger -A- O-10-31435Sugg Ranch (Canyon Dist 08)Independence Resources Mgmt, LLC72909K16.1MJan 1993 – Oct 2020
Pfluger "A" O-10-35665Lower Half (Wolfcamp)Independence Resources Mgmt, LLC39605K1.96MSep 1997 – Oct 2020

Gas, mcf lease total

Last 12 months 65,616 · prior 12 79,583(-18%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 1,658 · prior 12 2,993(-45%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1IP Petroleum Company, Inc.Jan 1993 → Jan 2001
  2. 2Pure Resources, L.P.Feb 2001 → Mar 2006
  3. 3Chevron Midcontinent, L.P.Apr 2006 → Jul 2016
  4. 4Own Resources Operating, LLCAug 2016 → Feb 2017
  5. 5Independence Resources Mgmt, LLCMar 2017 → Mar 2021
  6. 6Earthstone Operating, LLCApr 2021 → Dec 2022
  7. 7P1 Energy, LLCJan 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
511900-98RecompletionPure Resources, L.P.Feb 7, 2002Jul 26, 2001Jul 27, 20019,131
511900-99RecompletionPure Resources, L.P.Jul 26, 2001Jul 26, 2001—7,000
480830-99RecompletionIP Petroleum Company, Inc.Nov 13, 1998Nov 13, 1998—9,300
402782-99DrillIP Petroleum Company, Inc.Aug 26, 1992Aug 31, 1992Oct 4, 19927,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-31435————
—— O-10-35665————
—— O-10-54434————

Formation tops

As filed on W-2/G-1. Subsea from 2,555 ft elevation.Download CSV →

FormationMD ftSubsea
Dean5,984-3,429
Wolfcamp6,280-3,725
Canyon7,486-4,931
CanyonCANYON MARKER7,486-4,931
CanyonCANYON SAND7,540-4,985

Perforations

Perforated and open-hole intervals.

FromToType
6,6086,668Perforated
7,5437,686Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,800111,225 S
4.57,8507.8751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 4, 2020Dec 21, 2001Yes
00Jun 20, 2002Dec 21, 2001Yes
00May 10, 2002Nov 9, 1992Yes
00Dec 21, 1992Nov 9, 1992Yes
00Nov 17, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132193, documented in the API reference.