WELL · 42-451-32346 · DISTRICT 7
Johnson #2
Tom Green County · Christoval (Strawn 5100 Lower) field · Vertical
Johnson #2 (API 42-451-32346) is a plugged well in Tom Green County, plugged March 1, 2017, last operated by Lavanco Energy Ltd..
The RRC has issued one drilling permit, issued January 4, 1996, permitted to 5,999 ft.
It was permitted by Cholla Petroleum, Inc. and has since transferred to Lavanco Energy Ltd. on the wellbore schedule.
Its lease has reported 49.4K barrels of oil and 47.5K mcf of gas since February 1996, last reporting in July 2019. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cholla Petroleum, Inc.; the EWA schedule now lists a different operator.
- Based in
- San Angelo, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 6, 2023
- Permits on file
- 49
- Phone
- (325) 651-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lavanco Energy Ltd. |
| Production reports | Lavanco Energy, Ltd.through May 2014 |
| Latest permit | Cholla Petroleum, Inc.Jan 4, 1996 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,999
- total depth, ft
- 1
- permits on file
- Jan 4, 1996
- last permit issued
- Feb 22, 1996
- completed
- 49.4K
- cumulative oil, bbl
- 47.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1996 THROUGH Jul 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 22, 1996
- Shut in
- —
- Plugged
- Mar 1, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson O-9-14332 | Christoval (Strawn 5100, Lower) | Lavanco Energy, Ltd. | 2 | 49.4K | 47.5K | Feb 1996 – Jul 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cholla Petroleum, Inc.Feb 1996 → Jan 2005
- 2Lavanco Energy, Inc.Mar 2005 → Feb 2006
- 3Lavanco Energy, Ltd.Mar 2006 → May 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 443367-99 | Drill | Cholla Petroleum, Inc. | Jan 2, 1996 | Jan 4, 1996 | Jan 17, 1996 | 5,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-14332 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,338 | 5,342 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 393 | 12.25 | 200 S |
| 5.5 | 5,349 | 7.875 | 175 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 1996 | Feb 27, 1996 | Yes |
| 00 | Mar 5, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32346 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32346 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132346, documented in the API reference.