WELL · 42-451-32483 · DISTRICT 7

Turner Ranch T. D. 24 #2

N

Tom Green County  · Vertical

Turner Ranch T. D. 24 #2 (API 42-451-32483) is a former disposal or injection well in Tom Green County, last operated by Energy From Texas, L. P.; its UIC permit is no longer active.

The RRC has issued 2 drilling permits (amended twice) between 2005 and 2006, permitted to 9,000 ft.

Completion filings report 4 formation tops, including San Angelo, Canyon, T.O. Sand Pay, June Ann (Ellenburge).

Its lease has reported 109K barrels of oil and 152K mcf of gas since April 2005, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Energy From Texas, L. P.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 100 permits on file · (972) 658-7468

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsHibernia Resources IV, LLCthrough Apr 2026
Latest permitEnergy From Texas, L. P.Jan 31, 2006
9,000
total depth, ft
4
permits on file
Jan 31, 2006
last permit issued
—
completed
109K
cumulative oil, bbl
152K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Turner Ranch T. D. 24 O-9-15795June Ann (Ellenburger)Hibernia Resources IV, LLC3109K152KApr 2005 – Jul 2026

Gas, mcf lease total

Last 12 months 3,516 · prior 12 5,586(-37%)

05001K202420252026

Oil, barrels lease total

Last 12 months 159 · prior 12 0

0102030202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy From Texas, L. P.Apr 2005 → Nov 2010
  2. 2Banner Operating, LLCDec 2010 → Apr 2020
  3. 3Redbud E & P, Inc.Aug 2020 → Jul 2022
  4. 4Hibernia Resources IV, LLCJun 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
613045-99RecompletionEnergy From Texas, L. P.Jan 25, 2006Jan 31, 2006—9,000
601595-97DrillEnergy From Texas, L. P.Nov 15, 2005Jun 3, 2005Jun 14, 20057,640
601595-98DrillEnergy From Texas, L. P.Nov 21, 2005Jun 3, 2005Jun 14, 20057,640
601595-99DrillEnergy From Texas, L. P.Jun 3, 2005Jun 3, 2005Jun 14, 20059,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-15795————

Formation tops

As filed on W-2/G-1. Subsea from 2,355 ft elevation.Download CSV →

FormationMD ftSubsea
San AngeloSAN ANGELO SAND1,1601,195
CanyonUPPER CANYON SAND #16,650-4,295
CanyonUPPER CANYON SAND #26,708-4,353
CanyonUPPER CANYON SAND #36,736-4,381
T.O. Sand Pay6,792-4,437
June Ann (Ellenburge)7,346-4,991

Perforations

Perforated and open-hole intervals.

FromToType
7,4667,483Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564412.25305 S
4.53,9507.875150 S
4.58,2407.875540 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 2, 2006Nov 9, 2005Yes
00Nov 29, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112445W-14 DisposalNot activated10,0001,7653,530–3,840

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132483, documented in the API reference.