WELL · 42-451-32492 · DISTRICT 7

Whitehead #1

Plugged

Tom Green County · Wildcat field  · Vertical

Whitehead #1 (API 42-451-32492) is a plugged well in Tom Green County, plugged October 11, 2011, last operated by Paint Rock Operating LLC.

The RRC has issued one drilling permit, issued November 16, 2005, permitted to 5,500 ft.

Completion filings report 5 formation tops, including King Sandstone, Crosscut Sandstone, Upper Harkey Sand, Harkey Sandstone.

Operator of record

Paint Rock Operating LLC

Based in
San Angelo, TX
P-5 status
Delinquent (D)
P-5 last filed
Jul 28, 2015
Permits on file
285
Phone
(508) 548-5760

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePaint Rock Operating LLC
Production reportsnone
Latest permitPaint Rock Operating, LLCNov 16, 2005
5,500
total depth, ft
1
permits on file
Nov 16, 2005
last permit issued
May 9, 2006
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2006 THROUGH Feb 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 9, 2006
Shut in
—
Plugged
Oct 11, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitehead O-9-15993WildcatPaint Rock Operating, LLC200May 2006 – Feb 2012

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
609442-99DrillPaint Rock Operating, LLCNov 14, 2005Nov 16, 2005Feb 11, 20065,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-15993————

Formation tops

As filed on W-2/G-1. Subsea from 2,174 ft elevation.Download CSV →

FormationMD ftSubsea
King Sandstone3,244-1,070
Crosscut Sandstone4,310-2,136
Upper Harkey Sand4,404-2,230
Harkey Sandstone4,450-2,276
T/Strawn Limestone4,924-2,750

Perforations

Perforated and open-hole intervals.

FromToType
4,9404,950Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540211160 S
4.54,9407.875100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 5, 2007Aug 1, 2006Yes
00Aug 9, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132492, documented in the API reference.