WELL · 42-451-32510 · DISTRICT 7

Sugg 54 #4

N

Tom Green County · Sugg Ranch (Canyon) field  · Vertical

Sugg 54 #4 (API 42-451-32510) is a well in Tom Green County operated by Compass Energy Operating LLC, completed August 18, 2006.

The RRC has issued 2 drilling permits between 2006 and 2014, permitted to 7,800 ft.

Completion filings report 5 formation tops, including Clear Fork, Spraberry, Dean, Wolfcamp.

Its 3 leases have reported 16.1K barrels of oil and 59.3K mcf of gas since August 2006, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Compass Energy Operating LLC

Tulsa, OK · P-5 Y, filed Oct 4, 2025 · 27 permits on file · (325) 277-1754

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCompass Energy Operating LLC
Production reportsCompass Energy Operating, LLCthrough Oct 2024
Latest permitCompass Energy Operating, LLCSep 24, 2014
7,800
total depth, ft
2
permits on file
Sep 24, 2014
last permit issued
Aug 18, 2006
completed
16.1K
cumulative oil, bbl
59.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 18, 2006
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sugg 54 O-9-21268Spraberry (Trend Area)Compass Energy Operating, LLC17127.05KApr 2021 – Jul 2026
Sugg '54' O-9-18739Lonesome Reef (Wolfcamp)Compass Energy Operating, LLC12.54K14.8KNov 2014 – Jul 2021
Sugg "54" O-9-16017Sugg Ranch (Canyon)Compass Energy Operating, LLC112.8K37.5KAug 2006 – Apr 2015

Oil, barrels lease total

Last 12 months 0 · prior 12 0

050100202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 2(-100%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TXP, IncorporatedSep 2006 → Oct 2007
  2. 2Exco Resources, Inc.Nov 2007 → Jan 2013
  3. 3Exco/Hgi JV Assets, LLCFeb 2013 → Jun 2014
  4. 4Compass Energy Operating, LLCJul 2014 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
795475-99RecompletionCompass Energy Operating, LLCSep 3, 2014Sep 24, 2014Sep 14, 20147,375
618080-99DrillTXP, IncorporatedApr 24, 2006May 2, 2006Jun 24, 20067,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-16017————
—— O-9-18739————
—— O-9-21268————

Formation tops

As filed on W-2/G-1. Subsea from 2,542 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK3,090-548
Clear ForkCLEARFORK3,326-784
Spraberry4,501-1,959
Dean5,119-2,577
Wolfcamp5,735-3,193
Wolfcamp5,920-3,378
Canyon6,847-4,305
Canyon6,930-4,388

Perforations

Perforated and open-hole intervals.

FromToType
6,3096,325Perforated
6,3097,217Perforated
7,1577,160Perforated
7,1747,175Perforated
7,1937,194Perforated
7,2067,217Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04011400 S
4.57,3457.875450 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2021Mar 20, 2015—
00Apr 24, 2015Mar 20, 2015—
00Jan 30, 2015Dec 1, 2014Yes
00Jan 25, 2007Aug 31, 2006Yes
00Sep 6, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45132510, documented in the API reference.