WELL · 42-451-32586 · DISTRICT 7
Brenek Unit A #1
Tom Green County · Star Light (Hope) field · Vertical
Brenek Unit A #1 (API 42-451-32586) is a plugged well in Tom Green County, plugged March 2, 2012, last operated by Star Production Inc..
The RRC has issued one drilling permit (amended twice), issued May 30, 2008, permitted to 5,000 ft.
Completion filings report 3 formation tops, including Hope Lime, Breckenridge, Palo Pinto.
Its lease has reported 3.13K barrels of oil and 32 mcf of gas since October 2008, last reporting in September 2016.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 17, 2026
- Permits on file
- 192
- Phone
- (214) 739-4747
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Star Production Inc. |
| Production reports | Star Production, Inc.through May 2011 |
| Latest permit | Star Production, Inc.May 30, 2008 |
- 5,000
- total depth, ft
- 3
- permits on file
- May 30, 2008
- last permit issued
- Nov 28, 2008
- completed
- 3.13K
- cumulative oil, bbl
- 32
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2008 THROUGH Sep 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 28, 2008
- Shut in
- —
- Plugged
- Mar 2, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Brenek Unit "A" O-9-16832 | Star Light (Hope) | Star Production, Inc. | 1 | 3.13K | 32 | Oct 2008 – Sep 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Star Production, Inc.Oct 2008 → Dec 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 661762-97 | Drill | Star Production, Inc. | Dec 15, 2008 | May 30, 2008 | Jul 31, 2008 | 5,000 |
| 661762-98 | Drill | Star Production, Inc. | Jun 24, 2008 | May 30, 2008 | — | 5,000 |
| 661762-99 | Drill | Star Production, Inc. | May 12, 2008 | May 30, 2008 | Jul 31, 2008 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-16832 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,826 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Hope Lime | 2,390 | -564 |
| Breckenridge | 2,505 | -679 |
| Palo Pinto | 2,575 | -749 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,392 | 2,407 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 133 | 17.5 | 170 S |
| 8.625 | 2,171 | 11 | 325 S |
| 5.5 | 2,766 | 7.875 | 225 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 3, 2009 | Dec 15, 2008 | Yes |
| 00 | Feb 11, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32586 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32586 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132586, documented in the API reference.