WELL · 42-451-32814 · DISTRICT 7
Super Chicken #1
Tom Green County · Atrice (Strawn Lime) field · Vertical
Super Chicken #1 (API 42-451-32814) is a plugged well in Tom Green County, plugged August 3, 2023, last operated by Lavanco Energy Ltd..
The RRC has issued one drilling permit (amended once), issued July 23, 2014, permitted to 6,500 ft.
Completion filings report 7 formation tops, including Coleman Junction, Cisco, Canyon, Strawn.
Its 2 leases have reported 2.3K barrels of oil and 62.8K mcf of gas since October 2014, last reporting in October 2023. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
San Angelo, TX · P-5 Y, filed Nov 3, 2023 · 49 permits on file · (325) 277-0186
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lavanco Energy Ltd. |
| Production reports | Lavanco Energy, Ltd.through Apr 2023 |
| Latest permit | Lavanco Energy, Ltd.Jul 23, 2014 |
- 6,500
- total depth, ft
- 2
- permits on file
- Jul 23, 2014
- last permit issued
- Oct 2, 2014
- completed
- 2.3K
- cumulative oil, bbl
- 62.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2014 THROUGH Oct 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 2, 2014
- Shut in
- —
- Plugged
- Aug 3, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Super Chicken O-9-21307 | Atrice (Strawn Lime) | Lavanco Energy, Ltd. | 1 | 2.3K | 0 | Jun 2019 – Oct 2023 |
| Super Chicken G-9-275499 | Atrice (Strawn Lime) | Lavanco Energy, Ltd. | 1 | 0 | 62.8K | Oct 2014 – Jan 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Lavanco Energy, Ltd.Oct 2014 → Apr 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 789014-98 | Drill | Lavanco Energy, Ltd. | Nov 21, 2014 | Jul 23, 2014 | Aug 29, 2014 | 6,500 |
| 789014-99 | Drill | Lavanco Energy, Ltd. | Jun 9, 2014 | Jul 23, 2014 | Aug 28, 2014 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-275499 | — | — | — | — |
| — | — O-9-21307 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,103 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 1,812 | 291 |
| Cisco | 3,610 | -1,507 |
| Canyon | 4,753 | -2,650 |
| Strawn | 5,189 | -3,086 |
| Clear ForkCLEARFORK | — | — |
| San Andres | — | — |
| San Angelo | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,254 | 5,258 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 479 | 11 | 310 S |
| 5.5 | 5,728 | 7.875 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 18, 2021 | Jan 21, 2021 | — |
| 00 | Jan 22, 2015 | Dec 2, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-451-32814 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-451-32814 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45132814, documented in the API reference.