WELL · 42-457-30474 · DISTRICT 3

Arco Fee #6

Y

Tyler County · Highbaugh (L. Geronimo E. a ) field · Producing  · Vertical

Arco Fee #6 (API 42-457-30474) is a well in Tyler County operated by Neches Transport Inc., completed December 21, 1993 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 22, 1993, permitted to 11,000 ft.

It was permitted by Pecos Petroleum Company and has since transferred to Neches Transport Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Yegua, Wilcox.

Its lease has reported 178K barrels of oil and 1M mcf of gas since December 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Neches Transport Inc.

Permitted by Pecos Petroleum Company; the EWA schedule now lists a different operator.

Based in
Spurger, TX
P-5 status
Active (A)
P-5 last filed
Jan 21, 2026
Permits on file
1
Phone
(409) 429-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeches Transport Inc.
Production reportsNeches Transport Inc.through Apr 2026
Latest permitPecos Petroleum CompanyNov 22, 1993

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
1
permits on file
Nov 22, 1993
last permit issued
Dec 21, 1993
completed
178K
cumulative oil, bbl
1M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 21, 1993
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Fee O-3-22273Highbaugh (L. Geronimo E. "A")Neches Transport Inc.2178K1MDec 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 55 · prior 12 653(-92%)

0200400202420252026

Gas, mcf lease total

Last 12 months 2 · prior 12 10(-80%)

012202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pecos Petroleum CompanyJan 1994 → Oct 1999
  2. 2Roberson Oil CompanyNov 1999 → Nov 2002
  3. 3American Coastal Energy, Inc.Dec 2002 → Feb 2005
  4. 4Amorah, L.L.C.Mar 2005 → Jul 2005
  5. 5Forest Oil CorporationAug 2005 → Nov 2010
  6. 6McDaniel Company, Inc., TheDec 2010 → Dec 2017
  7. 7Hydrocarbon Operating, Inc.Jan 2018 → Dec 2025
  8. 8Neches Transport Inc.Feb 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418579-99DrillPecos Petroleum CompanyNov 22, 1993Nov 22, 1993Nov 27, 199311,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22273————

Formation tops

As filed on W-2/G-1. Subsea from 137 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua5,600-5,463
Wilcox8,630-8,493

Perforations

Perforated and open-hole intervals.

FromToType
9,1979,207Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,57011467 S
5.59,9017.875438 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 21, 1994Jan 19, 1994Yes
00Feb 23, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730474, documented in the API reference.