TEXAS · WELLS · TYLER COUNTY · BLACKSTONE MINERALS UNIT A-6 LEASE · API 42-457-30582 · DISTRICT 06

Blackstone Minerals Unit A-6 #1

Shut in

Tyler County · Brookeland (Austin Chalk 8800) field · Temp Abandoned  · Horizontal

Blackstone Minerals Unit A-6 #1 (API 42-457-30582) is a horizontal well in Tyler County operated by Zarvona Energy LLC, completed November 18, 2004 and listed as temp abandoned on the RRC schedule, shut in August 1, 2025.

The RRC has issued one drilling permit (amended once), issued September 7, 2004, permitted to 13,309 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Midway, Pecan Gap, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Jul 2025
Latest permitAnadarko E&P Company LPSep 7, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,309
total depth, ft
2
permits on file
Sep 7, 2004
last permit issued
Nov 18, 2004
completed
0
cumulative oil, bbl
6.71M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 18, 2004
Shut in
Aug 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blackstone Minerals Unit A-6 G-6-207708Brookeland (Austin Chalk, 8800)Zarvona Energy LLC106.71MNov 2004 – Jul 2026

Gas, mcf lease total

Last 12 months 11,149 · prior 12 68,302(-84%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPNov 2004 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Mar 2016
  3. 3Zarvona Energy LLCApr 2016 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
550541-98DrillAnadarko E&P Company LPFeb 17, 2005Sep 7, 2004—13,821
550541-99DrillAnadarko E&P Company LPSep 7, 2004Sep 7, 2004Sep 12, 20048,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 18, 2004Blackstone Minerals Unit A-6 G-6-207708Brookeland (Austin Chalk 8800)Zarvona Energy LLCTemp Abandoned · shut in Aug 1, 202513,309

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox6,078-5,700
Midway10,433-10,055
Pecan Gap12,409-12,031
Austin Chalk13,233-12,855

Perforations

Perforated and open-hole intervals.

FromToType
13,29520,785Perforated
13,31119,915Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,06714.751,230 S
7.62512,2859.875275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 5, 2005Jan 5, 2005Yes
00Apr 25, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730582, documented in the API reference.