WELL · 42-457-30639 · DISTRICT 6
Mary Louise #1
Tyler County · Brookeland (Austin Chalk 8800) field · Horizontal
Mary Louise #1 (API 42-457-30639) is a plugged horizontal well in Tyler County, plugged June 28, 2012, last operated by Southern Bay Operating L.L.C..
The RRC has issued one drilling permit (amended once), issued July 18, 2006, permitted to 16,000 ft.
It was permitted by Range Production Company and has since transferred to Southern Bay Operating L.L.C. on the wellbore schedule.
Completion filings report 5 formation tops, including Wilcox, Midway, Navarro, Taylor.
Operator of record
Permitted by Range Production Company; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 16, 2013
- Permits on file
- 96
- Phone
- (281) 537-9920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Southern Bay Operating L.L.C. |
| Production reports | Range Production Companythrough Aug 2010 |
| Latest permit | Range Production CompanyJul 18, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 2
- permits on file
- Jul 18, 2006
- last permit issued
- Dec 23, 2006
- completed
- 0
- cumulative oil, bbl
- 4.91K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2006 THROUGH Jun 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 23, 2006
- Shut in
- —
- Plugged
- Jun 28, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mary Louise G-6-231451 | Brookeland (Austin Chalk, 8800) | Southern Bay Operating, L.L.C. | 1 | 0 | 4.91K | Dec 2006 – Jun 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Range Production CompanySep 2007 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 622515-98 | Drill | Range Production Company | Nov 7, 2006 | Jul 18, 2006 | Oct 5, 2006 | 13,650 |
| 622515-99 | Drill | Range Production Company | Jul 13, 2006 | Jul 18, 2006 | Oct 5, 2006 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-231451 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 243 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,633 | 19,020 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,932 | 14.75 | 1,501 S |
| 7.625 | 10,633 | 9.875 | 1,071 S |
| 7.625 | 13,633 | 9.875 | 1,071 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 12, 2008 | Aug 22, 2008 | — |
| 00 | Jan 4, 2008 | Sep 20, 2007 | Yes |
| 00 | Dec 11, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-457-30639 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-457-30639 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/45730639, documented in the API reference.