TEXAS · WELLS · TYLER COUNTY · BLACK STONE MINERALS A-354 LEASE · API 42-457-30651 · DISTRICT 06

Black Stone Minerals A-354 #2

Y

Tyler County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Black Stone Minerals A-354 #2 (API 42-457-30651) is a horizontal well in Tyler County operated by Zarvona Energy LLC, completed April 1, 2007 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 4, 2006, permitted to 13,580 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Wilcox, Midway, Navarro, Pecan Gap.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPDec 4, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,580
total depth, ft
1
permits on file
Dec 4, 2006
last permit issued
Apr 1, 2007
completed
0
cumulative oil, bbl
1.76M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 1, 2007
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Minerals A-354 G-6-228201Brookeland (Austin Chalk, 8800)Zarvona Energy LLC101.76MApr 2007 – Jul 2026

Gas, mcf lease total

Last 12 months 10,038 · prior 12 4,035(+149%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPApr 2007 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Mar 2016
  3. 3Zarvona Energy LLCApr 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
629047-99DrillAnadarko E&P Company LPNov 15, 2006Dec 4, 2006Jan 19, 200714,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 2007Black Stone Minerals A-354 G-6-228201Brookeland (Austin Chalk 8800)Zarvona Energy LLCProducing13,580

Formation tops

As filed on W-2/G-1. Subsea from 378 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,503-5,125
Midway10,115-9,737
Navarro11,611-11,233
Pecan Gap11,856-11,478
Taylor12,252-11,874
Austin ChalkBASE AUSTIN CHALK13,376-12,998

Perforations

Perforated and open-hole intervals.

FromToType
13,14320,751Perforated
13,19519,210Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,10014.751,375 S
7.62513,1309.6251,155 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 24, 2007May 16, 2007Yes
00Jul 19, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730651, documented in the API reference.