TEXAS · WELLS · TYLER COUNTY · BLACK STONE TAYLOR A-33 UNIT LEASE · API 42-457-30701 · DISTRICT 06

Black Stone Taylor a-33 Unit #1

Y

Tyler County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Black Stone Taylor A-33 Unit #1 (API 42-457-30701) is a horizontal well in Tyler County operated by Zarvona Energy LLC, completed December 19, 2008 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued June 19, 2008, permitted to 14,172 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Midway, Navarro, Ozan, Taylor.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPJun 19, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,172
total depth, ft
2
permits on file
Jun 19, 2008
last permit issued
Dec 19, 2008
completed
0
cumulative oil, bbl
2.59M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 19, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Taylor a-33 Unit G-6-250302Brookeland (Austin Chalk, 8800)Zarvona Energy LLC102.59MDec 2008 – Jul 2026

Gas, mcf lease total

Last 12 months 75,589 · prior 12 66,766(+13%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPDec 2008 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Mar 2016
  3. 3Zarvona Energy LLCApr 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
658306-98DrillAnadarko E&P Company LPAug 12, 2009Jun 19, 2008Jul 3, 200814,172
658306-99DrillAnadarko E&P Company LPMar 27, 2008Jun 19, 2008Jul 3, 200815,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 19, 2008Black Stone Taylor a-33 Unit G-6-250302Brookeland (Austin Chalk 8800)Zarvona Energy LLCProducing14,172

Formation tops

As filed on W-2/G-1. Subsea from 354 ft elevation.Download CSV →

FormationMD ftSubsea
Midway10,298-9,944
Navarro12,663-12,309
Ozan13,257-12,903
Taylor13,336-12,982
Austin ChalkAUSTIN13,788-13,434

Perforations

Perforated and open-hole intervals.

FromToType
13,79319,300Perforated
17,00719,821Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,20017.51,966 S
7.62513,84512.25762 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 25, 2009Feb 11, 2009Yes
00Aug 21, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.