TEXAS · WELLS · TYLER COUNTY · BLACK STONE SCHMIED A 1070 UNIT LEASE · API 42-457-30721 · DISTRICT 06

Black Stone Schmied a 1070 Unit #1

Y

Tyler County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Black Stone Schmied A 1070 Unit #1 (API 42-457-30721) is a horizontal well in Tyler County operated by Zarvona Energy LLC, completed April 17, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued September 25, 2008, permitted to 13,138 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Midway, Upper Cretaceous, Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPSep 25, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,138
total depth, ft
2
permits on file
Sep 25, 2008
last permit issued
Apr 17, 2009
completed
0
cumulative oil, bbl
93.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 17, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Schmied a 1070 Unit G-6-254119Brookeland (Austin Chalk, 8800)Zarvona Energy LLC1093.2KApr 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 1,630 · prior 12 2,028(-20%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPApr 2009 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Mar 2016
  3. 3Zarvona Energy LLCApr 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
670739-98DrillAnadarko E&P Company LPDec 14, 2009Sep 25, 2008Dec 31, 200814,000
670739-99DrillAnadarko E&P Company LPSep 8, 2008Sep 25, 2008Dec 31, 200816,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 17, 2009Black Stone Schmied a 1070 Unit G-6-254119Brookeland (Austin Chalk 8800)Zarvona Energy LLCProducing13,138

Formation tops

As filed on W-2/G-1. Subsea from 365 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,620-5,255
Midway10,040-9,675
Upper Cretaceous11,480-11,115
Austin Chalk12,596-12,231

Perforations

Perforated and open-hole intervals.

FromToType
12,65019,750Perforated
16,19517,415Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,99717.51,796 S
7.62512,64012.25795 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 13, 2010Mar 2, 2010—
00Aug 12, 2010Jul 29, 2009Yes
00Jan 22, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730721, documented in the API reference.