TEXAS · WELLS · TYLER COUNTY · BLACK STONE SOUTH A-7 LEASE · API 42-457-30735 · DISTRICT 06

Black Stone South A-7 #2

Y

Tyler County · Brookeland (Austin Chalk 8800) field · Producing  · Horizontal

Black Stone South A-7 #2 (API 42-457-30735) is a horizontal well in Tyler County operated by Zarvona Energy LLC, completed December 2, 2009 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 10, 2009, permitted to 13,893 ft.

It was permitted by Anadarko E&P Company LP and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Wilcox, Midway, U Cretaceous, Ozan.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Anadarko E&P Company LP; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2026
Latest permitAnadarko E&P Company LPJun 10, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,893
total depth, ft
1
permits on file
Jun 10, 2009
last permit issued
Dec 2, 2009
completed
0
cumulative oil, bbl
5.02M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 2, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone South A-7 G-6-256403Brookeland (Austin Chalk, 8800)Zarvona Energy LLC105.02MDec 2009 – Jul 2026

Gas, mcf lease total

Last 12 months 89,056 · prior 12 98,423(-10%)

05K10K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPDec 2009 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Mar 2016
  3. 3Zarvona Energy LLCApr 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
681952-99DrillAnadarko E&P Company LPJun 8, 2009Jun 10, 2009Sep 8, 200916,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 2, 2009Black Stone South A-7 G-6-256403Brookeland (Austin Chalk 8800)Zarvona Energy LLCProducing13,893

Formation tops

As filed on W-2/G-1. Subsea from 379 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox6,343-5,964
Midway11,370-10,991
U Cretaceous12,370-11,991
Ozan12,910-12,531
Taylor13,115-12,736
Austin Chalk13,458-13,079

Perforations

Perforated and open-hole intervals.

FromToType
13,64519,707Perforated
13,65016,483Perforated
15,71720,852Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,08514.751,350 S
7.62513,6339.875985 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 13, 2010Mar 3, 2010Yes
00Jul 5, 2010——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45730735, documented in the API reference.