TEXAS · WELLS · UPSHUR COUNTY · FLUELLEN LEASE · API 42-459-30627 · DISTRICT 06

Fluellen #1

Plugged

Upshur County · Cherokee Trace (Jurassic) field  · Vertical

Fluellen #1 (API 42-459-30627) is a plugged well in Upshur County, plugged December 4, 1995, last operated by Marathon Oil Company.

The RRC has issued one drilling permit, issued April 26, 1984, permitted to 13,750 ft.

It was permitted by Txo Production Corp. and has since transferred to Marathon Oil Company on the wellbore schedule.

Completion filings report 3 formation tops, including Base Mass Anhyd., Travis Peak, Cotton Valley.

Its lease has reported 1.05K barrels of oil and 91.3K mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Marathon Oil Company

Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Delinquent (D)
P-5 last filed
Aug 14, 2025
Permits on file
3,707
Phone
(281) 293-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarathon Oil Company
Production reportsMarathon Oil Companythrough May 1995
Latest permitTXO Production Corp.Apr 26, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,750
total depth, ft
1
permits on file
Apr 26, 1984
last permit issued
Jul 31, 1984
completed
1.05K
cumulative oil, bbl
91.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1994 THROUGH May 1995

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 31, 1984
Shut in
—
Plugged
Dec 4, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fluellen G-6-112448Cherokee Trace (Jurassic)Marathon Oil Company11.05K91.3KJan 1993 – May 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyMar 1994 → May 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
236943-99DrillTXO Production Corp.Apr 26, 1984Apr 26, 1984May 7, 198413,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 31, 1984Fluellen G-6-112448Cherokee Trace (Jurassic)Marathon Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 428 ft elevation.Download CSV →

FormationMD ftSubsea
Base Mass Anhyd.7,180-6,752
Travis Peak8,340-7,912
Cotton ValleyCOTTON VALLEY LM11,816-11,388

Perforations

Perforated and open-hole intervals.

FromToType
11,11211,124Perforated
12,00412,026Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1663208 sx
9.6254,62512.251,400 sx
711,7008.751,475 sx

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 13, 1995Jul 25, 1995—
00Sep 21, 1984Aug 30, 1984—
00Sep 19, 1984Aug 30, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45930627, documented in the API reference.