WELL · 42-459-30982 · DISTRICT 6

Jackson James Gas Unit #4

Plugged

Upshur County · Gilmer(jurassic) field  · Vertical

Jackson James Gas Unit #4 (API 42-459-30982) is a plugged well in Upshur County, plugged December 16, 2025, last operated by Apache Corporation.

The RRC has issued 2 drilling permits (amended twice) between 1999 and 2008, permitted to 12,000 ft.

Completion filings report 5 formation tops, including Glen Rose, B. Massive, Pettit, Bossier.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsCci Gulf Coast Upstream LLCthrough Jan 2015
Latest permitApache CorporationJul 14, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
4
permits on file
Jul 14, 2008
last permit issued
Dec 31, 1999
completed
0
cumulative oil, bbl
660K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1999 THROUGH Nov 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 31, 1999
Shut in
—
Plugged
Dec 16, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson, James Gas Unit G-6-243251Gilmer (Cotton Valley Sands)Diversified Production LLC1025.2KOct 2008 – Nov 2025
Jackson, James Gas Unit G-6-175929Gilmer(jurassic)Apache Corporation10635KDec 1999 – Feb 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Apache CorporationDec 1999 → Nov 2011
  2. 2Patara Oil & Gas LLCDec 2011 → Feb 2012
  3. 3Patara Andover I LLCMar 2012 → Feb 2014
  4. 4Cci Gulf Coast Upstream LLCMar 2014 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
665159-99RecompletionApache CorporationJun 23, 2008Jul 14, 2008Jul 29, 200812,000
487422-97DrillApache CorporationNov 8, 1999Sep 9, 1999Nov 6, 199912,000
487422-98DrillApache CorporationOct 12, 1999Sep 9, 1999—12,000
487422-99DrillApache CorporationSep 9, 1999Sep 9, 1999—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-175929————
—— G-6-243251————

Formation tops

As filed on W-2/G-1. Subsea from 394 ft elevation.Download CSV →

FormationMD ftSubsea
Glen Rose5,680-5,286
B. Massive7,220-6,826
Pettit7,897-7,503
Bossier11,142-10,748
Cotton ValleyCOTTON VALLEY LIME11,650-11,256
Cotton ValleyCOTTON VALLEY LM11,650-11,256

Perforations

Perforated and open-hole intervals.

FromToType
10,99811,008Perforated
11,68611,694Perforated
11,70611,710Perforated
11,73211,736Perforated
11,75511,796Perforated
11,80011,811Perforated
11,82311,837Perforated
11,84011,878Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,16212.25880 S
5.512,0007.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2009Dec 1, 2008Yes
00Dec 22, 2008——
00Mar 27, 2000Feb 11, 2000Yes
00Mar 8, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45930982, documented in the API reference.