TEXAS · WELLS · UPSHUR COUNTY · GLADEWATER GU 19 LEASE · API 42-459-31157 · DISTRICT 06

Gladewater GU 19 #10

Shut in

Upshur County · Glenwood (Cotton Valley) field · Temp Abandoned  · Vertical

Gladewater GU 19 #10 (API 42-459-31157) is a well in Upshur County operated by Diversified Production LLC, completed October 24, 2003 and listed as temp abandoned on the RRC schedule, shut in March 1, 2016.

The RRC has issued one drilling permit, issued August 27, 2003, permitted to 11,150 ft.

It was permitted by Wagner & Brown, Ltd. and has since transferred to Diversified Production LLC on the wellbore schedule.

Completion filings report 3 formation tops, including B/Massive, T/Rodessa, T/Travis Peak.

No lease production has been reported under this well’s leases.

Operator of record

Diversified Production LLC

Permitted by Wagner & Brown, Ltd.; the EWA schedule now lists a different operator.

Based in
Keithville, LA
P-5 status
Active – Extension (X)
P-5 last filed
Mar 25, 2026
Permits on file
11
Phone
(318) 751-3917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiversified Production LLC
Production reportsBreitburn Operating L.P.through Feb 2016
Latest permitWagner & Brown, Ltd.Aug 27, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,150
total depth, ft
1
permits on file
Aug 27, 2003
last permit issued
Oct 24, 2003
completed
0
cumulative oil, bbl
183K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 24, 2003
Shut in
Mar 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gladewater GU 19 G-6-199060Glenwood (Cotton Valley)Diversified Production LLC10183KOct 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Oneok Texas Energy Resources, LPNov 2003 → Nov 2005
  2. 2Txok Texas Energy Resources,l.p.Dec 2005 → Dec 2007
  3. 3Exco Partners Operating Ptshp LPJan 2008 → Jun 2008
  4. 4Exco Operating Company, LPJul 2008 → Aug 2009
  5. 5Encore Operating, L.P.Sep 2009 → Aug 2010
  6. 6Quantum Resources Management,llcSep 2010 → Dec 2014
  7. 7Breitburn Operating L.P.Jan 2015 → Feb 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535458-99DrillWagner & Brown, Ltd.Aug 18, 2003Aug 27, 2003Sep 17, 200311,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 24, 2003Gladewater GU 19 G-6-199060Glenwood (Cotton Valley)Diversified Production LLCTemp Abandoned · shut in Mar 1, 201611,150

Formation tops

As filed on W-2/G-1. Subsea from 430 ft elevation.Download CSV →

FormationMD ftSubsea
B/Massive7,100-6,670
T/Rodessa7,220-6,790
T/Travis Peak7,990-7,560

Perforations

Perforated and open-hole intervals.

FromToType
10,85910,994Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,27611325 S
4.511,1507.8752,500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2004Dec 23, 2003Yes
00Feb 11, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/45931157, documented in the API reference.