TEXAS · WELLS · UPTON COUNTY · MC ELROY RANCH CO #130 LEASE · API 42-461-03461 · DISTRICT 6E
Mc Elroy Ranch Co #130 #24
Upton County · Wildcat field · Vertical
MC Elroy Ranch CO #130 #24 (API 42-461-03461) is a plugged well in Upton County, plugged June 19, 1995, last operated by Exxon Corp..
The RRC has issued one drilling permit, issued April 12, 1994, permitted to 12,221 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- See remarks (S)
- P-5 last filed
- Mar 15, 1999
- Permits on file
- 19,549
- Phone
- (713) 431-1125
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Exxon Corp. |
| Production reports | none |
| Latest permit | Exxon Corp.Apr 12, 1994 |
- 12,221
- total depth, ft
- 1
- permits on file
- Apr 12, 1994
- last permit issued
- Jul 17, 1994
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1994 THROUGH Jul 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 17, 1994
- Shut in
- —
- Plugged
- Jun 19, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Mc Elroy Ranch Co #130 O-9-13651 | Wildcat | Exxon Corp. | 1 | 0 | 0 | Jul 1994 – Jul 1995 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422892-99 | Reenter | Exxon Corp. | Apr 11, 1994 | Apr 12, 1994 | May 10, 1994 | 12,221 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 17, 1994 | Mc Elroy Ranch Co #130 O-9-13651 | Wildcat | Exxon Corp. | Plugged | — |
| — | McElroy Ranch Co. #130 O-9-2137 | Wilshire (Ellenburger) | XTO Energy Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,748 | 4,808 | Perforated |
| — | 12,035 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 209 | 17.5 | 220 S |
| 9.625 | 4,735 | 12.25 | 5,000 S |
| 7 | 12,050 | 8.75 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 14, 1994 | Jul 22, 1994 | — |
| 00 | Aug 5, 1994 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-03461 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-03461 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46103461, documented in the API reference.