TEXAS · WELLS · UPTON COUNTY · NEAL "40-38" LEASE · API 42-461-31874 · DISTRICT 6E

Neal 40-38 #2

Shut in

Upton County · Spraberry (Trend Area) field · Shut In  · Vertical

Neal 40-38 #2 (API 42-461-31874) is a well in Upton County operated by Ovintiv USA Inc., completed June 10, 1982 and listed as shut in on the RRC schedule, shut in April 1, 2020.

The RRC has issued one drilling permit, issued December 31, 1981, permitted to 9,300 ft.

It was permitted by Cox, John L. and has since transferred to Ovintiv USA Inc. on the wellbore schedule.

Its lease has reported 69.6K barrels of oil and 294K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Ovintiv USA Inc.

Permitted by Cox, John L.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active (A)
P-5 last filed
Dec 12, 2025
Permits on file
1,391
Phone
(720) 876-5176

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOvintiv USA Inc.
Production reportsOvintiv USA Inc.through Jan 2020
Latest permitCox, John L.Dec 31, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,300
total depth, ft
1
permits on file
Dec 31, 1981
last permit issued
Jun 10, 1982
completed
69.6K
cumulative oil, bbl
294K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2020

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 10, 1982
Shut in
Apr 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal "40-38" O-9-9469Spraberry (Trend Area)Ovintiv USA Inc.269.6K294KJan 1993 – Jan 2020

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cox, John L.Jan 1993 → Sep 2003
  2. 2JM Cox Resources, L.P.Oct 2003 → Apr 2014
  3. 3Athlon Holdings LPMay 2014 → Jan 2015
  4. 4Encana Oil & Gas(usa) Inc.Feb 2015 → Jan 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
146813-99DrillCox, John L.Dec 31, 1981Dec 31, 1981—9,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 10, 1982Neal 40-38 O-9-9469Spraberry (Trend Area)Ovintiv USA Inc.Shut In · shut in Apr 1, 20209,300

Perforations

Perforated and open-hole intervals.

FromToType
7,6149,272Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7544517.5400 S
8.6254,940111,000 S
2.8757,440——
4.59,3007.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 28, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46131874, documented in the API reference.