WELL · 42-461-32085 · DISTRICT 7
McElroy Ranch Co. M #22
Upton County · Willrode (Leonard Lime) field · Vertical
Mcelroy Ranch CO. M #22 (API 42-461-32085) is a well in Upton County operated by Xto Energy Inc., completed November 9, 1995.
The RRC has issued 3 drilling permits (amended once) between 1983 and 2006, permitted to 10,431 ft.
Completion filings report 7 formation tops, including Anhy/Salt/Lime, Spraberry, Leonard, Dean.
Its 3 leases have reported 358K barrels of oil and 4.18M mcf of gas since January 1993, last reporting in July 2026. The leases carry 9 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Apr 2026 |
| Latest permit | XTO Energy Inc.Aug 29, 2006 |
- 10,431
- total depth, ft
- 4
- permits on file
- Aug 29, 2006
- last permit issued
- Nov 9, 1995
- completed
- 358K
- cumulative oil, bbl
- 4.18M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 9, 1995
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McElroy Ranch Co. "M" O-9-6583 | King Mountain, N. (Cisco) | XTO Energy Inc. | 7 | 347K | 4.04M | Jan 1993 – Jul 2026 |
| McElroy Ranch Co. "M" O-9-10621 | King Mountain, N. (Cisco 9100) | Chevron U. S. A. Inc. | 1 | 0 | 0 | Jan 1993 – Mar 2008 |
| McElroy Ranch Co. "M" O-9-13543 | Willrode (Leonard Lime) | XTO Energy Inc. | 1 | 11.5K | 137K | Nov 1993 – Jul 2007 |
Gas, mcf lease total
Last 12 months 28,535 · prior 12 34,383(-17%)
Oil, barrels lease total
Last 12 months 1,539 · prior 12 2,131(-28%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 623727-98 | Recompletion | XTO Energy Inc. | Sep 13, 2006 | Aug 29, 2006 | May 5, 2006 | 10,431 |
| 623727-99 | Recompletion | XTO Energy Inc. | Aug 2, 2006 | Aug 29, 2006 | — | 10,431 |
| 415478-99 | Recompletion | Chevron U. S. A. Inc. | Aug 30, 1993 | Oct 15, 1993 | Nov 3, 1993 | 9,800 |
| 219365-99 | Drill | Gulf Oil Corp. | Mar 19, 1984 | Nov 1, 1983 | — | 10,431 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-6583 | — | — | — | — |
| — | — O-9-10621 | — | — | — | — |
| — | — O-9-13543 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,697 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,391 | 7,438 | Perforated |
| 9,072 | 9,076 | Perforated |
| 9,075 | 9,153 | Perforated |
| 9,094 | 9,098 | Perforated |
| 9,118 | 9,122 | Perforated |
| 9,843 | 10,217 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 525 | 17.5 | 400 S |
| 8.625 | 4,199 | 11 | 1,100 S |
| 5.5 | 10,431 | 7.875 | 1,050 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 31, 2007 | Jun 14, 2007 | Yes |
| 00 | Jul 19, 2007 | Nov 7, 1996 | — |
| 00 | Jan 14, 1997 | Nov 7, 1996 | — |
| 00 | Jan 24, 1994 | Nov 18, 1993 | Yes |
| 00 | Dec 6, 1993 | Mar 19, 1984 | — |
| 00 | Apr 19, 1984 | Mar 19, 1984 | — |
| 00 | Apr 7, 1984 | Mar 19, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-32085 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-32085 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46132085, documented in the API reference.