WELL · 42-461-32814 · DISTRICT 7

McElroy Ranch Co. M #29

N

Upton County · King Mountain N. (Cisco) field  · Vertical

Mcelroy Ranch CO. M #29 (API 42-461-32814) is a well in Upton County operated by Xto Energy Inc., completed August 12, 1988.

The RRC has issued 2 drilling permits between 1988 and 2009, permitted to 10,800 ft.

Completion filings report 7 formation tops, including Mcelroy, Dean, Wolfcamp, Cisco.

Its 3 leases have reported 386K barrels of oil and 5.32M mcf of gas since January 1993, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Nov 4, 2009
10,800
total depth, ft
2
permits on file
Nov 4, 2009
last permit issued
Aug 12, 1988
completed
386K
cumulative oil, bbl
5.32M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 12, 1988
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McElroy Ranch Co. "M" G-9-183119King Mountain, N. (Cisco)XTO Energy Inc.10673KMay 2001 – Jul 2026
McElroy Ranch Co. "M" O-9-6583King Mountain, N. (Cisco)XTO Energy Inc.7347K4.04MJan 1993 – Jul 2026
McElroy Ranch Co. "M" O-9-7101King Mountain, N.(strawn)XTO Energy Inc.539.7K610KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 36,546 · prior 12 35,685(+2%)

05K10K202420252026

Oil, barrels lease total

Last 12 months 2,927 · prior 12 2,607(+12%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
686840-99RecompletionXTO Energy Inc.Nov 2, 2009Nov 4, 2009Oct 2, 200910,000
348114-99DrillChevron U. S. A. Inc.Jun 23, 1988Jun 24, 1988Jun 27, 198810,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-183119————
—— O-9-6583————
—— O-9-7101————

Formation tops

As filed on W-2/G-1. Subsea from 2,766 ft elevation.Download CSV →

FormationMD ftSubsea
McElroy4,216-1,450
Dean7,857-5,091
WolfcampWOLFCAMP / CISCO7,990-5,224
Cisco9,032-6,266
Strawn9,218-6,452
Strawn9,241-6,475
AtokaATOKA/BEND9,577-6,811
Atoka9,709-6,943
Bend9,709-6,943

Perforations

Perforated and open-hole intervals.

FromToType
8,5049,086Perforated
8,7289,084Perforated
9,3349,476Perforated
9,7409,768Perforated
9,7999,845Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7543014.75260 S
8.6254,200111,200 S
5.59,9537.875470 S
5.59,9987.875470 S
5.5—7.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 2010Mar 13, 2010Yes
00Apr 6, 2010——
00Aug 20, 2001Jun 21, 2001—
00Jul 12, 2001——
00Sep 2, 1988Aug 23, 1988Yes
00Aug 30, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46132814, documented in the API reference.