TEXAS · WELLS · UPTON COUNTY · MCELROY RANCH CO. 132 LEASE · API 42-461-35792 · DISTRICT 6E
McElroy Ranch Co. 132 #50H
Upton County · Wilshire (Consolidated) field · Temp Abandoned · Horizontal
Mcelroy Ranch CO. 132 #50H (API 42-461-35792) is a horizontal well in Upton County operated by Xto Energy Inc., completed October 10, 2008 and listed as temp abandoned on the RRC schedule, shut in July 1, 2022.
The RRC has issued one drilling permit, issued April 18, 2008, permitted to 11,701 ft.
It was permitted by Encore Operating, L.P. and has since transferred to Xto Energy Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Barnett, Woodford, Thirtyone, Wilshire.
Its lease has reported 23.2K barrels of oil and 459K mcf of gas since October 2008, with no volume in the three years through April 2026.
Operator of record
Permitted by Encore Operating, L.P.; the EWA schedule now lists a different operator.
- Based in
- Spring, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 16,156
- Phone
- (346) 502-1572
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | XTO Energy Inc. |
| Production reports | XTO Energy Inc.through Jul 2023 |
| Latest permit | Encore Operating, L.P.Apr 18, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,701
- total depth, ft
- 1
- permits on file
- Apr 18, 2008
- last permit issued
- Oct 10, 2008
- completed
- 23.2K
- cumulative oil, bbl
- 459K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Jul 2023
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Oct 10, 2008
- Shut in
- Jul 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McElroy Ranch Co. 132 G-9-246017 | Wilshire (Consolidated) | XTO Energy Inc. | 1 | 23.2K | 459K | Oct 2008 – Jul 2023 |
No volumes reported on these leases in the last three years.
Wells named McElroy Ranch Co. 132
XTO Energy Inc.'s other wells filed under this lease name in Upton County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Encore Operating, L.P.Nov 2008 → Jun 2009
- 2Exxon Mobil CorporationJul 2009 → Dec 2011
- 3XTO Energy Inc.Jan 2012 → Jun 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 658785-99 | Drill | Encore Operating, L.P. | Apr 3, 2008 | Apr 18, 2008 | Jun 13, 2008 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 10, 2008 | McElroy Ranch Co. 132 G-9-246017 | Wilshire (Consolidated) | XTO Energy Inc. | Temp Abandoned · shut in Jul 1, 2022 | 11,701 |
Formation tops
As filed on W-2/G-1. Subsea from 2,827 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,720 | 12,080 | Perforated |
| 12,280 | 12,640 | Perforated |
| 12,840 | 13,200 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 504 | 17.5 | 430 S |
| 9.625 | 5,504 | 12.25 | 685 S |
| 7 | 10,997 | 8.75 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 28, 2009 | Oct 30, 2008 | Yes |
| 00 | Mar 31, 2009 | — | — |
Well logs
1 log loaded from the RRC's log index, the latest received Sep 20, 2011. Density, Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| NEUTRON/DENSITY POROSITYSpans Barnett, Woodford, Thirtyone | TIFF | 200 to 10,917 | Sep 20, 2011run Jul 24, 2008 | 4.68 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-461-35792 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-461-35792 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46135792, documented in the API reference.