TEXAS · WELLS · UPTON COUNTY · DAVIDSON "2C" LEASE · API 42-461-37578 · DISTRICT 6E

Davidson 2C #6

Shut in

Upton County · Spraberry (Trend Area) field · Shut In  · Vertical

Davidson 2c #6 (API 42-461-37578) is a well in Upton County operated by Ovintiv USA Inc., completed December 17, 2011 and listed as shut in on the RRC schedule, shut in February 1, 2022.

The RRC has issued one drilling permit, issued September 7, 2011, permitted to 11,530 ft.

It was permitted by Athlon Energy Operating LLC and has since transferred to Ovintiv USA Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Clear Fork, Spraberry, Atoka.

Its lease has reported 65.9K barrels of oil and 131K mcf of gas since March 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Ovintiv USA Inc.

Permitted by Athlon Energy Operating LLC; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active (A)
P-5 last filed
Dec 12, 2025
Permits on file
1,390
Phone
(720) 876-5176

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOvintiv USA Inc.
Production reportsOvintiv USA Inc.through Apr 2026
Latest permitAthlon Energy Operating LLCSep 7, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,530
total depth, ft
1
permits on file
Sep 7, 2011
last permit issued
Dec 17, 2011
completed
65.9K
cumulative oil, bbl
131K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 17, 2011
Shut in
Feb 1, 2022
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davidson "2C" O-9-17127Spraberry (Trend Area)Ovintiv USA Inc.265.9K131KMar 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 575 · prior 12 588(-2%)

0100200202420252026

Gas, mcf lease total

Last 12 months 1,900 · prior 12 1,959(-3%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sandridge Expl. and Prod., LLCMay 2010 → Sep 2010
  2. 2Athlon Energy Operating LLCOct 2010 → Dec 2013
  3. 3Athlon Holdings LPJan 2014 → Jan 2015
  4. 4Encana Oil & Gas(usa) Inc.Feb 2015 → Jan 2020
  5. 5Ovintiv USA Inc.Feb 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
721897-99DrillAthlon Energy Operating LLCAug 9, 2011Sep 7, 2011Oct 16, 201112,550

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 17, 2011Davidson 2C O-9-17127Spraberry (Trend Area)Ovintiv USA Inc.Shut In · shut in Feb 1, 202211,530

Formation tops

As filed on W-2/G-1. Subsea from 2,823 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK6,001-3,178
Spraberry7,739-4,916
AtokaATOKA/BEND11,103-8,280

Perforations

Perforated and open-hole intervals.

FromToType
9,21611,306Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37542617.5425 S
8.6254,58711850 S
5.511,5297.8751,150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 2013Feb 29, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46137578, documented in the API reference.