WELL · 42-461-40183 · DISTRICT 9

Church Disposal Well #1WD

WaterN

Upton County  · Vertical

Church Disposal Well #1WD (API 42-461-40183) is a former disposal or injection well in Upton County, last operated by Bold Operating, LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued September 8, 2015, permitted to 8,000 ft.

Operator of record

Bold Operating, LLC

Based in
The Woodlands, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 7, 2019
Permits on file
113
Phone
(432) 686-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBold Operating, LLCSep 8, 2015
8,000
total depth, ft
1
permits on file
Sep 8, 2015
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
809872-99DrillBold Operating, LLCAug 28, 2015Sep 8, 2015—8,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113005W-14 DisposalCanceled Feb 12, 201910,0002,2003,500–6,375

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46140183, documented in the API reference.