TEXAS · WELLS · VAL VERDE COUNTY · REMEDIOS 42 LEASE · API 42-465-10216 · DISTRICT 01
Remedios 42 #1
Val Verde County · Wildcat field · Vertical
Remedios 42 #1 (API 42-465-10216) is a plugged well in Val Verde County, plugged November 4, 2009, last operated by Chesapeake Operating Inc..
The RRC has issued one drilling permit, issued September 21, 2005, permitted to 20,000 ft.
Operator of record
- Based in
- Oklahoma City, OK
- P-5 status
- Delinquent (D)
- P-5 last filed
- Dec 10, 2024
- Permits on file
- 13,061
- Phone
- (405) 935-3100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | none |
| Latest permit | Chesapeake Operating, Inc.Sep 21, 2005 |
- 20,000
- total depth, ft
- 1
- permits on file
- Sep 21, 2005
- last permit issued
- Oct 30, 2005
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2005 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 30, 2005
- Shut in
- —
- Plugged
- Nov 4, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Remedios 42 G-1-212619 | Wildcat | Chesapeake Operating, Inc. | 1 | 0 | 0 | Oct 2005 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 606724-99 | Reenter | Chesapeake Operating, Inc. | Sep 21, 2005 | Sep 21, 2005 | — | 20,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 30, 2005 | Remedios 42 G-1-212619 | Wildcat | Chesapeake Operating Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,707 | 3,772 | Perforated |
| 3,795 | 3,810 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 20 | 1,854 | — | — |
| 5.5 | 4,100 | 13.375 | 1,430 S |
| 13.375 | 4,515 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 15, 2006 | Nov 28, 2005 | Yes |
| 00 | Dec 13, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-465-10216 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-465-10216 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46510216, documented in the API reference.