TEXAS · WELLS · VAL VERDE COUNTY · API 42-465-30479 · DISTRICT 6E

Cauthorn 3 #1

Y

Val Verde County · JO Nell (Canyon D) field · Producing  · Vertical

Cauthorn 3 #1 (API 42-465-30479) is a well in Val Verde County operated by Three Forks Resources LLC, completed February 13, 1992 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1991 and 1992, permitted to 10,531 ft.

It was permitted by Thompson, J. Cleo and has since transferred to Three Forks Resources LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Aldwell, Jonell, Strawn.

No lease production has been reported under this well’s leases.

Operator of record

Three Forks Resources LLC

Permitted by Thompson, J. Cleo; the EWA schedule now lists a different operator.

Based in
Wheat Ridge, CO
P-5 status
Active (A)
P-5 last filed
Sep 15, 2025
Phone
(303) 318-0717

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThompson J. Cleo
Production reportsThree Forks Resources, LLCthrough Dec 2025
Latest permitThompson, J. CleoApr 22, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,531
total depth, ft
2
permits on file
Apr 22, 1992
last permit issued
Feb 13, 1992
completed
0
cumulative oil, bbl
158K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 13, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cauthorn 3 G-9-141287JO Nell (Canyon D)Three Forks Resources, LLC10158KJan 1993 – Jul 2026
— G-1-139855——000—

Gas, mcf lease total

Last 12 months 1,052 · prior 12 1,250(-16%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thompson, J. CleoJan 1993 → Sep 2020
  2. 2BRP Energy, LLCOct 2020 → Apr 2022
  3. 3Three Forks Resources, LLCMay 2022 → Dec 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
398136-99RecompletionThompson, J. CleoApr 15, 1992Apr 22, 1992Feb 5, 199210,531
388063-99DrillThompson, J. CleoMay 17, 1991May 21, 1991May 30, 199110,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 13, 1992Cauthorn 3 G-9-141287JO Nell (Canyon D)Three Forks Resources LLCProducing10,531
Jul 12, 1991Cauthorn 3 G-1-139855Vinegarone (Strawn)Thompson J. CleoNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,046 ft elevation.Download CSV →

FormationMD ftSubsea
Aldwell7,907-5,861
Jonell8,670-6,624
Strawn10,388-8,342

Perforations

Perforated and open-hole intervals.

FromToType
8,8408,698Perforated
10,40310,456Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,63611650 S
4.510,5317.875775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 1992Apr 3, 1992Yes
00May 14, 1992——
00Jan 10, 1992Nov 4, 1991Yes
00Nov 27, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46530479, documented in the API reference.