TEXAS · WELLS · VAL VERDE COUNTY · API 42-465-30608 · DISTRICT 6E

Cauthorn -F- #3

Plugged

Val Verde County · JO Nell (Canyon D) field  · Vertical

Cauthorn -F- #3 (API 42-465-30608) is a plugged well in Val Verde County, plugged April 11, 2008, last operated by Conocophillips Company.

The RRC has issued 2 drilling permits between 2000 and 2003, permitted to 10,250 ft.

Completion filings report 4 formation tops, including Permian (undifferentiated), Jo Mill, Jo Nell Canyon, Strawn.

Its 2 leases have reported 28 barrels of oil and 124K mcf of gas since April 2000, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Conocophillips Company

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 3, 2026
Permits on file
3,290
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConocophillips Company
Production reportsConocophillips Companythrough Jul 2006
Latest permitConocophillips CompanyAug 11, 2003
10,250
total depth, ft
2
permits on file
Aug 11, 2003
last permit issued
Nov 20, 2007
completed
28
cumulative oil, bbl
124K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2000 THROUGH Jul 2006

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 20, 2007
Shut in
—
Plugged
Apr 11, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cauthron "F" G-1-177150Vinegarone (Strawn)Conocophillips Company128124KApr 2000 – Jul 2006
Cauthorn -F- G-9-203482JO Nell (Canyon D)Conocophillips Company100Oct 2003 – —

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyApr 2000 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Jul 2006

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535055-99RecompletionConocophillips CompanyAug 7, 2003Aug 11, 2003Sep 11, 200310,250
491054-99DrillPhillips Petroleum CompanyJan 13, 2000Jan 13, 2000Mar 8, 200010,150

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 20, 2007Cauthorn -F- G-9-203482JO Nell (Canyon D)Conocophillips CompanyPlugged—
Apr 16, 2000Cauthron F G-1-177150Vinegarone (Strawn)Conocophillips CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,082 ft elevation.Download CSV →

FormationMD ftSubsea
Permian (undifferentiated)PERMIAN9001,182
Jo MillJO MILL CANYON8,100-6,018
JO Nell Canyon8,100-6,018
StrawnBASE STRAWN8,890-6,808
StrawnSTRAWN LIME9,854-7,772

Perforations

Perforated and open-hole intervals.

FromToType
8,5858,869Perforated
8,7478,784Perforated
8,8438,876Perforated
9,8709,884Perforated
9,9709,984Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,61812.25412 S
4.510,2367.875670 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 24, 2008Jan 28, 2008—
00Dec 2, 2004Feb 6, 2004—
00Sep 29, 2004——
00Apr 9, 2003Nov 4, 2002—
00Jun 26, 2000May 24, 2000Yes
00Jun 8, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46530608, documented in the API reference.