TEXAS · WELLS · VAN ZANDT COUNTY · JARMAN, W. T. 37 LEASE · API 42-467-00221 · DISTRICT 05

Jarman W. T. 37 #8

Plugged

Van Zandt County · Van (Austin Chalk) field  · Vertical

Jarman W. T. 37 #8 (API 42-467-00221) is a plugged well in Van Zandt County, plugged November 15, 1993, last operated by Basa Resources Inc..

The RRC has issued one drilling permit, issued December 14, 1987, permitted to 3,227 ft.

It was permitted by Union Expl. Partners, Ltd. and has since transferred to Basa Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

Its lease has reported 316K barrels of oil and 612K mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

Operator of record

Basa Resources Inc.

Permitted by Union Expl. Partners, Ltd.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Feb 12, 2026
Permits on file
472
Phone
(214) 580-5206

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBasa Resources Inc.
Production reportsBasa Resources, Inc.through Apr 2026
Latest permitUnion Expl. Partners, Ltd.Dec 14, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,227
total depth, ft
1
permits on file
Dec 14, 1987
last permit issued
Jan 31, 1988
completed
316K
cumulative oil, bbl
612K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 31, 1988
Shut in
—
Plugged
Nov 15, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jarman, W. T. 37 O-5-3189Van (Austin Chalk)Basa Resources, Inc.10316K612KJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 95 · prior 12 240(-60%)

0204060202420252026

Gas, mcf lease total

Last 12 months 436 · prior 12 220(+98%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Oil Company of CaliforniaJan 1993 → Oct 2013
  2. 2Basa Resources, Inc.Dec 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
340015-99RecompletionUnion Expl. Partners, Ltd.Dec 10, 1987Dec 14, 1987—3,227

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 31, 1988Jarman W. T. 37 O-5-3189Van (Austin Chalk)Basa Resources Inc.Plugged—
—Jarman W. T. 37 O-5-1172VanBasa Resources Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 503 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk2,511-2,008

Perforations

Perforated and open-hole intervals.

FromToType
2,5112,698Perforated
—2,900Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7529614175 S
72,8699.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 29, 1988Mar 1, 1988Yes
00Apr 23, 1988——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46700221, documented in the API reference.