WELL · 42-467-30558 · DISTRICT 5

Blake R. S. #25

Plugged

Van Zandt County · Van (Shallow) field  · Vertical

Blake R. S. #25 (API 42-467-30558) is a plugged well in Van Zandt County, plugged January 16, 2015, last operated by Wagner Oil Company.

The RRC has issued 2 drilling permits between 1983 and 2009, permitted to 3,265 ft.

Completion filings report 4 formation tops, including Pecan Gap, Taylor, Woodbine, Washita.

Its 2 leases have reported 1.48M barrels of oil and 797K mcf of gas since January 1993, last reporting in July 2026. The leases carry 20 wells, so these are lease totals, not this well alone.

Operator of record

Wagner Oil Company

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsBasa Resources, Inc.through Apr 2026
Latest permitWagner Oil CompanyNov 18, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,265
total depth, ft
2
permits on file
Nov 18, 2009
last permit issued
Mar 26, 2010
completed
1.48M
cumulative oil, bbl
797K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 26, 2010
Shut in
—
Plugged
Jan 16, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blake, R. S. O-5-1111VanBasa Resources, Inc.191.48M797KJan 1993 – Jul 2026
Blake, R. S. O-5-3913Van (Shallow)Wagner Oil Company100Mar 2010 – Jun 2015

Oil, barrels lease total

Last 12 months 41,068 · prior 12 39,045(+5%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 17,618 · prior 12 18,595(-5%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2008
  3. 3Wagner Oil CompanyJul 2008 → Dec 2020
  4. 4Team Operating, L.L.C.Jan 2021 → Apr 2021
  5. 5Basa Resources, Inc.May 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687467-99RecompletionWagner Oil CompanyNov 17, 2009Nov 18, 2009Mar 22, 20102,766
225596-99DrillExxon Corp.Sep 14, 1983Dec 5, 1983—3,265

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-1111————
—— O-5-3913————

Formation tops

As filed on W-2/G-1. Subsea from 467 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap1,743-1,276
Taylor1,950-1,483
Woodbine2,506-2,039
Washita2,760-2,293

Perforations

Perforated and open-hole intervals.

FromToType
1,3021,316Perforated
2,6062,619Perforated
2,6462,662Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62556212.5440 S
9.62565212.25440 sx
5.52,7648.5360 sx
5.52,7658.5360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 2010——
00May 7, 2010Apr 8, 2010—
00May 2, 1988Mar 25, 1988—
00Jun 7, 1984Mar 14, 1984—
00Jun 2, 1984Mar 14, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46730558, documented in the API reference.