WELL · 42-469-03183 · DISTRICT 2
O Conner Louise A #1
Victoria County · Anaqua North (5375) field · Vertical
O Conner Louise A #1 (API 42-469-03183) is a plugged well in Victoria County, plugged August 15, 2011, last operated by Southern Bay Operating L.L.C..
The RRC has issued 3 drilling permits between 1981 and 1999, permitted to 6,500 ft.
It was permitted by Hart Petroleum Services, Inc and has since transferred to Southern Bay Operating L.L.C. on the wellbore schedule.
Operator of record
Permitted by Hart Petroleum Services, Inc; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- May 16, 2013
- Permits on file
- 96
- Phone
- (281) 537-9920
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Brown, C. Douglas, LLCthrough Dec 2002 |
| Latest permit | Hart Petroleum Services, IncApr 19, 1999 |
- 6,500
- total depth, ft
- 3
- permits on file
- Apr 19, 1999
- last permit issued
- Mar 25, 1999
- completed
- 0
- cumulative oil, bbl
- 119K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1999 THROUGH Aug 2011
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 25, 1999
- Shut in
- —
- Plugged
- Aug 15, 2011
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| O'Conner, Louise "A" G-2-173204 | Anaqua, North (5375) | Southern Bay Operating, L.L.C. | 1 | 0 | 119K | Mar 1999 – Aug 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hart Petroleum Services, IncMar 1999 → Oct 2002
- 2Brown, C. Douglas, LLCNov 2002 → Dec 2002
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 483114-99 | Reenter | Hart Petroleum Services, Inc | Mar 5, 1999 | Apr 19, 1999 | Mar 16, 1999 | 5,800 |
| 183336-99 | Recompletion | Harkins & Company | Jan 11, 1983 | Jan 11, 1983 | — | 6,500 |
| 124999-99 | Drill | Harkins & Co.-Cox, Edwin L. | Jul 14, 1981 | Jul 14, 1981 | — | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 25, 1999 | O Conner Louise A G-2-173204 | Anaqua North (5375) | Southern Bay Operating L.L.C. | Plugged | — |
| Jul 17, 1968 | Williams Kemper O-2-4384 | Anaqua North (5600) | Wilson Vern Energy Inc. | Plugged | — |
| Jul 1, 1968 | Kemper-Williams G-2-44562 | Anaqua North (5375) | Harkins & Company | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,334 | 5,337 | Perforated |
| 5,374 | 5,379 | Perforated |
| — | 5,601 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 273 | 13.75 | 225 S |
| 2.375 | 5,300 | — | — |
| 4.5 | 5,828 | 7.875 | 916 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 1999 | Apr 8, 1999 | Yes |
| 00 | Jun 24, 1999 | — | — |
| 00 | Jan 12, 1984 | Aug 6, 1968 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-03183 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-03183 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46903183, documented in the API reference.