TEXAS · WELLS · VICTORIA COUNTY · API 42-469-30140 · DISTRICT 02

Lewis #1

Plugged

Victoria County · Mission Valley ( 8 650) field  · Vertical

Lewis #1 (API 42-469-30140) is a plugged well in Victoria County, plugged December 6, 1979, last operated by Outline Oil Corp..

The RRC has issued one drilling permit, issued March 30, 1978, permitted to 9,915 ft.

Operator of record

Outline Oil Corp.

Based in
San Antonio, TX
P-5 status
Delinquent (D)
P-5 last filed
Jun 29, 2026
Permits on file
135
Phone
(210) 820-0112

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOutline Oil Corp.
Production reportsnone
Latest permitOutline Oil Corp.Mar 30, 1978
9,915
total depth, ft
1
permits on file
Mar 30, 1978
last permit issued
Jun 1, 1972
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 1972
Shut in
—
Plugged
Dec 6, 1979

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
21082-99RecompletionOutline Oil Corp.Mar 30, 1978Mar 30, 1978—9,915

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 1, 1972Lewis G-2-53007Mission Valley ( 8 650)Outline Oil Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,5478,555Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,15212.25—
4.58,6807.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jun 30, 1972—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46930140, documented in the API reference.