WELL · 42-469-30309 · DISTRICT 2
Oconnor Dennis et AL #1
Victoria County · Telferner (2500) field · Vertical
Oconnor Dennis ET AL #1 (API 42-469-30309) is a plugged well in Victoria County, plugged June 5, 2007, last operated by Braman D. H. JR..
The RRC has issued 3 drilling permits between 1977 and 1994, permitted to 2,550 ft.
Completion filings report 3 formation tops, including Catahoula, Greta, Lowe Greta.
Operator of record
- Based in
- Victoria, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 15, 2008
- Permits on file
- 111
- Phone
- (361) 578-6171
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Braman D. H. Jr. |
| Production reports | Braman, D. H., Jr.through May 1996 |
| Latest permit | Braman, D. H., Jr.Jun 23, 1994 |
- 2,550
- total depth, ft
- 3
- permits on file
- Jun 23, 1994
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 111K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jun 5, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| O'Connor, Dennis et AL G-2-150564 | Telferner (1450) | Allegro Investments, Inc. | 1 | 0 | 63.2K | Jul 1994 – Jun 2007 |
| O'Connor, Dennis et AL G-2-139311 | Telferner (2000) | Braman, D. H., Jr. | 1 | 0 | 47.5K | Jan 1993 – Jul 1994 |
| — G-2-73352 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Braman, D. H., Jr.Jan 1993 → May 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 424822-99 | Recompletion | Braman, D. H., Jr. | Jun 20, 1994 | Jun 23, 1994 | Jul 18, 1994 | 2,460 |
| 390773-99 | Recompletion | Braman, D. H., Jr. | Aug 12, 1991 | Aug 15, 1991 | Aug 20, 1991 | 2,460 |
| 4419-99 | Recompletion | Braman, D. H., Jr. | Aug 2, 1977 | Aug 2, 1977 | — | 2,550 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-73352 | — | — | — | — |
| — | — G-2-139311 | — | — | — | — |
| — | — G-2-150564 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 92 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,312 | 1,316 | Perforated |
| 1,978 | 1,981 | Perforated |
| 2,568 | 2,574 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,181 | 15 | 640 S |
| 4.5 | 2,658 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 3, 1995 | Aug 12, 1994 | Yes |
| 00 | Aug 26, 1994 | — | — |
| 00 | Dec 2, 1991 | Aug 30, 1991 | Yes |
| 00 | Sep 26, 1991 | — | — |
| 00 | Jan 12, 1984 | Sep 29, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-30309 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-30309 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46930309, documented in the API reference.