TEXAS · WELLS · VICTORIA COUNTY · G-2-132703 LEASE · API 42-469-32288 · DISTRICT 02
Sladacek Gas Unit #5
Victoria County · Helen Gohlke ( Frio 3250) field · Vertical
Sladacek Gas Unit #5 (API 42-469-32288) is a plugged well in Victoria County, plugged July 23, 1991, last operated by Quail Creek Oil Corporation.
The RRC has issued 3 drilling permits between 1984 and 1989, permitted to 6,500 ft.
Completion filings report 2 formation tops, including Frio, Yegua.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 7, 2026
- Permits on file
- 144
- Phone
- (713) 956-2070
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Quail Creek Oil Corporation |
| Production reports | none |
| Latest permit | Quail Creek Oil CorporationOct 30, 1989 |
- 6,500
- total depth, ft
- 3
- permits on file
- Oct 30, 1989
- last permit issued
- Nov 6, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 6, 1990
- Shut in
- —
- Plugged
- Jul 23, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-2-132703 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 365488-99 | Recompletion | Quail Creek Oil Corporation | Oct 23, 1989 | Oct 30, 1989 | — | 6,013 |
| 346706-99 | Recompletion | Mosbacher Energy Company | May 18, 1988 | May 20, 1988 | — | 6,013 |
| 253358-99 | Drill | Union Texas Petroleum Corp. | Aug 28, 1984 | Oct 2, 1984 | — | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 6, 1990 | Sladacek Gas Unit G-2-132703 | Helen Gohlke ( Frio 3250) | Quail Creek Oil Corporation | Plugged | — |
| Nov 6, 1990 | Sladacek Gas Unit G-2-132703 | Helen Gohlke ( Frio 3250) | Quail Creek Oil Corporation | Plugged | — |
| Jan 15, 1985 | Garrett W. D. G-2-114877 | Kemper East (5650) | Quail Creek Oil Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 140 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,129 | 3,131 | Perforated |
| 3,177 | 3,180 | Perforated |
| 5,530 | 5,540 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 673 | 12.25 | 450 S |
| 8.625 | 678 | 12.25 | 450 S |
| 5.5 | 5,920 | 7.875 | 615 S |
| 5.5 | 6,012 | 7.875 | 835 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 6, 1991 | Nov 14, 1990 | — |
| 00 | Jan 16, 1990 | Dec 19, 1989 | Yes |
| 00 | Jan 9, 1990 | Dec 6, 1989 | — |
| 00 | Dec 28, 1989 | — | — |
| 00 | Mar 6, 1985 | Feb 8, 1985 | — |
| 00 | Feb 28, 1985 | Jan 16, 1985 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-32288 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-32288 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46932288, documented in the API reference.