TEXAS · WELLS · VICTORIA COUNTY · MCFADDIN -A- LEASE · API 42-469-33061 · DISTRICT 02

McFaddin -A- #64

Plugged

Victoria County · McFaddin North (5400) field  · Vertical

Mcfaddin -A- #64 (API 42-469-33061) is a plugged well in Victoria County, plugged November 1, 2023, last operated by Americo Energy Resources LLC.

The RRC has issued one drilling permit (amended once), issued September 2, 1994, permitted to 6,300 ft.

It was permitted by Anaqua Oil & Gas, Inc. and has since transferred to Americo Energy Resources LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Creta, Greta, Gretta (Top), Sinton.

Operator of record

Americo Energy Resources LLC

Permitted by Anaqua Oil & Gas, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 29, 2025
Permits on file
80
Phone
(713) 984-9700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAmerico Energy Resources LLC
Production reportsAnaqua Oil & Gas, Inc.through Feb 1995
Latest permitAnaqua Oil & Gas, Inc.Sep 2, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
2
permits on file
Sep 2, 1994
last permit issued
Sep 15, 1994
completed
0
cumulative oil, bbl
48.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Oct 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 15, 1994
Shut in
—
Plugged
Nov 1, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McFaddin -A- G-2-151960McFaddin, North (5400)Americo Energy Resources, LLC1048.8KSep 1994 – Oct 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anaqua Oil & Gas, Inc.Sep 1994 → Feb 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427692-98DrillAnaqua Oil & Gas, Inc.Nov 14, 1994Sep 2, 1994—5,400
427692-99DrillAnaqua Oil & Gas, Inc.Sep 2, 1994Sep 2, 1994Sep 4, 19946,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 15, 1994McFaddin -A- G-2-151960McFaddin North (5400)Americo Energy Resources LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 65 ft elevation.Download CSV →

FormationMD ftSubsea
Creta4,530-4,465
GretaGRETA (TOP)4,530-4,465
Gretta (Top)4,530-4,465
Sinton5,150-5,085
Sinton (Top)5,150-5,085

Perforations

Perforated and open-hole intervals.

FromToType
4,7704,800Perforated
5,4675,471Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564312.25240 S
4.55,9947.875958 S
4.56,0247.875340 S
4.5—7.875440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 16, 2005Aug 23, 2004—
00Feb 20, 2004Nov 7, 2003—
00Mar 3, 1997Feb 5, 1997Yes
00Feb 23, 1995Nov 10, 1994Yes
00Dec 15, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
838K
bbl, all reported
Nov 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082941W-14 DisposalPlugged Nov 13, 20233,0007504,550–4,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 6,310(-100%)

01K2K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46933061, documented in the API reference.