TEXAS · WELLS · VICTORIA COUNTY · KOLLE, DENNIS RAY ET AL LEASE · API 42-469-33217 · DISTRICT 02
Kolle Dennis Ray et Al #1
Victoria County · Colletoville Creek (Frio 3800) field · Vertical
Kolle Dennis Ray ET AL #1 (API 42-469-33217) is a plugged well in Victoria County, plugged October 31, 2001, last operated by Edge Petroleum Oper. CO. Inc..
The RRC has issued one drilling permit (amended once), issued March 11, 1997, permitted to 4,000 ft.
Completion filings report one formation top, including Catahola.
Its lease has reported 234K mcf of gas since May 1997, with no volume in the three years through April 2026.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 15, 2010
- Permits on file
- 433
- Phone
- (713) 954-5588
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Edge Petroleum Oper. Co. Inc. |
| Production reports | Edge Petroleum Oper. Co., Inc.through Aug 2000 |
| Latest permit | Edge Petroleum Oper. Co., Inc.Mar 11, 1997 |
- 4,000
- total depth, ft
- 2
- permits on file
- Mar 11, 1997
- last permit issued
- May 7, 1997
- completed
- 0
- cumulative oil, bbl
- 234K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Aug 2000
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 7, 1997
- Shut in
- —
- Plugged
- Oct 31, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kolle, Dennis Ray et Al G-2-170726 | Colletoville Creek (Frio 3800) | Edge Petroleum Oper. Co., Inc. | 1 | 0 | 234K | May 1997 – Aug 2000 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Edge Petroleum Oper. Co., Inc.May 1997 → Aug 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459720-98 | Drill | Edge Petroleum Oper. Co., Inc. | Mar 16, 1998 | Mar 11, 1997 | — | 3,900 |
| 459720-99 | Drill | Edge Petroleum Oper. Co., Inc. | Mar 11, 1997 | Mar 11, 1997 | Sep 6, 1997 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 7, 1997 | Kolle Dennis Ray et Al G-2-170726 | Colletoville Creek (Frio 3800) | Edge Petroleum Oper. Co. Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 133 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Catahola | 2,480 | -2,347 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,747 | 3,750 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 382 | 12.25 | 200 S |
| 2.875 | 3,885 | 7.875 | 764 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 27, 1999 | Aug 11, 1997 | Yes |
| 00 | Nov 13, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33217 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33217 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933217, documented in the API reference.