TEXAS · WELLS · VICTORIA COUNTY · COOLEY, M. E. LEASE · API 42-469-33418 · DISTRICT 02
Cooley M. E. #5
Victoria County · Mission Valley W.(wilcox 10600) field · Temp Abandoned · Vertical
- Fields on the latest permit · any of 5
- Mission Valley, W. (Mass Wilcox) · Mission Valley, West (Massive-1) · Field 62157740 · Mission Valley, W.(wilcox 10600) · Mission Valley,w(wcx 10600 SEG2)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Cooley M. E. #5 (API 42-469-33418) is a well in Victoria County operated by Proline Energy Resources Inc, completed September 19, 1999 and listed as temp abandoned on the RRC schedule, shut in November 1, 2009.
The RRC has issued one drilling permit, issued July 13, 1999, permitted to 10,800 ft.
It was permitted by Union Gas Operating Company and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report 2 formation tops, including Frio, Wilcox.
Its lease has reported 24.7K barrels of oil and 1.44M mcf of gas since September 1999, with no volume in the three years through April 2026.
Operator of record
Permitted by Union Gas Operating Company; the EWA schedule now lists a different operator.
- Based in
- Sugar Land, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (832) 886-4420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough May 2010 |
| Latest permit | Union Gas Operating CompanyJul 13, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,800
- total depth, ft
- 1
- permits on file
- Jul 13, 1999
- last permit issued
- Sep 19, 1999
- completed
- 24.7K
- cumulative oil, bbl
- 1.44M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH May 2010
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 19, 1999
- Shut in
- Nov 1, 2009
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cooley, M. E. G-2-177148 | Mission Valley, W.(wilcox 10600) | Proline Energy Resources Inc | 1 | 24.7K | 1.44M | Sep 1999 – May 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Gas Operating CompanySep 1999 → May 2001
- 2KCS Resources, Inc.Jun 2001 → Nov 2007
- 3Milagro Exploration, LLCDec 2007 → May 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485827-99 | Drill | Union Gas Operating Company | Jul 13, 1999 | Jul 13, 1999 | Jul 31, 1999 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 19, 1999 | Cooley M. E. G-2-177148 | Mission Valley W.(wilcox 10600) | Proline Energy Resources Inc | Temp Abandoned · shut in Nov 1, 2009 | 10,800 |
Formation tops
As filed on W-2/G-1. Subsea from 173 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,462 | 10,472 | Perforated |
| 10,476 | 10,482 | Perforated |
| 10,486 | 10,508 | Perforated |
| 10,520 | 10,534 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,763 | 14.75 | 875 S |
| 7.625 | 9,700 | 9.875 | 250 S |
| 4.5 | 10,800 | 6.75 | 270 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 22, 2002 | Oct 29, 2001 | — |
| 00 | Jan 2, 2002 | Aug 13, 2001 | — |
| 00 | Sep 27, 2000 | Dec 6, 1999 | Yes |
| 00 | Jun 8, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33418 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33418 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933418, documented in the API reference.