TEXAS · WELLS · VICTORIA COUNTY · COLETO POINT LEASE · API 42-469-33439 · DISTRICT 02
Coleto Point #1
Victoria County · Mission Valley W. (Wilcox G) field · Producing · Vertical
- Fields on the latest permit · any of 10
- Bullock's Church, S. (10,000) · Bullock's Church, S. (10500) · Field 13276675 · Bullock's Church, S. (12500) · Mission Valley (10,220) · Field 62157740 · Mission Valley, W. (Wilcox G) · Mission Valley, W.(wilcox 10600) · Mission Valley,w(wcx 10600 SEG2) · Mistletoe
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Coleto Point #1 (API 42-469-33439) is a well in Victoria County operated by Proline Energy Resources Inc, completed March 10, 2000 and listed as producing on the RRC schedule, shut in August 1, 2026.
The RRC has issued one drilling permit, issued October 11, 1999, permitted to 15,500 ft.
It was permitted by Union Gas Operating Company and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.
Its lease has reported 1.5K barrels of oil and 2.5M mcf of gas since March 2000, last reporting volume in March 2026.
Operator of record
Permitted by Union Gas Operating Company; the EWA schedule now lists a different operator.
- Based in
- Sugar Land, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (832) 886-4420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Proline Energy Resources Inc |
| Production reports | Proline Energy Resources Incthrough Mar 2026 |
| Latest permit | Union Gas Operating CompanyOct 11, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 15,500
- total depth, ft
- 1
- permits on file
- Oct 11, 1999
- last permit issued
- Mar 10, 2000
- completed
- 1.5K
- cumulative oil, bbl
- 2.5M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2000 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 10, 2000
- Shut in
- Aug 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Coleto Point G-2-176813 | Mission Valley, W. (Wilcox G) | Proline Energy Resources Inc | 1 | 1.5K | 2.5M | Mar 2000 – Mar 2026 |
Gas, mcf lease total
Last 12 months 31,095 · prior 12 46,456(-33%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Union Gas Operating CompanyMar 2000 → May 2001
- 2KCS Resources, Inc.Jun 2001 → Nov 2007
- 3Milagro Exploration, LLCDec 2007 → Oct 2015
- 4White Oak Operating Company LLCNov 2015 → Jul 2022
- 5Sanchez Exploration Company LLCAug 2022 → Mar 2024
- 6White Stride LLCApr 2024 → Nov 2025
- 7Proline Energy Resources IncDec 2025 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 488361-99 | Drill | Union Gas Operating Company | Oct 11, 1999 | Oct 11, 1999 | Oct 20, 1999 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 10, 2000 | Coleto Point G-2-176813 | Mission Valley W. (Wilcox G) | Proline Energy Resources Inc | Producing · shut in Aug 1, 2026 | 15,500 |
Formation tops
As filed on W-2/G-1. Subsea from 141 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,196 | 13,212 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,779 | 17.5 | 1,330 S |
| 9.625 | 10,270 | 12.25 | 495 S |
| 5 | 13,940 | 6.75 | 230 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 18, 2000 | Mar 30, 2000 | Yes |
| 00 | May 12, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33439 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33439 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933439, documented in the API reference.