WELL · 42-469-33519 · DISTRICT 2

Cooley M. E. #8

N

Victoria County · Mission Valley W.(wilcox 10600) field  · Vertical

Cooley M. E. #8 (API 42-469-33519) is a well in Victoria County operated by Kcs Resources Inc., completed November 8, 2000.

The RRC has issued 2 drilling permits between 2000 and 2004, permitted to 12,500 ft.

Completion filings report 3 formation tops, including Frio, Yegua, Wilcox.

Its 2 leases have reported 5.7K barrels of oil and 693K mcf of gas since November 2000, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

KCS Resources Inc.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 1, 2008
Permits on file
490
Phone
(713) 248-1340

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKCS Resources Inc.
Production reportsProline Energy Resources Incthrough Apr 2026
Latest permitKCS Resources, Inc.Sep 30, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
Sep 30, 2004
last permit issued
Nov 8, 2000
completed
5.7K
cumulative oil, bbl
693K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 8, 2000
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cooley, M.E. O-2-8902Mission Valley (9050 Wilcox)Proline Energy Resources Inc15.7K286KSep 2004 – Jul 2026
Cooley, M. E. G-2-180986Mission Valley, W.(wilcox 10600)KCS Resources, Inc.10406KNov 2000 – Dec 2004

Gas, mcf lease total

Last 12 months 8,922 · prior 12 6,259(+43%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 18 · prior 12 118(-85%)

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Gas Operating CompanyNov 2000 → May 2001
  2. 2KCS Resources, Inc.Jun 2001 → Nov 2007
  3. 3Milagro Exploration, LLCDec 2007 → Oct 2015
  4. 4White Oak Operating Company LLCDec 2015 → May 2022
  5. 5Sanchez Exploration Company LLCAug 2022 → Mar 2024
  6. 6White Stride LLCMay 2024 → Feb 2025
  7. 7Proline Energy Resources IncFeb 2026 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
551599-99RecompletionKCS Resources, Inc.Sep 27, 2004Sep 30, 2004—11,565
500150-99DrillUnion Gas Operating CompanySep 28, 2000Sep 28, 2000Oct 13, 200012,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-2-180986————
—— O-2-8902————

Formation tops

As filed on W-2/G-1. Subsea from 177 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,820-2,643
Yegua5,100-4,923
Wilcox8,730-8,553

Perforations

Perforated and open-hole intervals.

FromToType
8,7928,800Perforated
9,4429,447Perforated
10,55010,566Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,80014.75—
7.6259,7009.875—
4.510,7006.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 10, 2004Sep 24, 2004Yes
00Oct 7, 2004——
00May 1, 2001Dec 15, 2000Yes
00Mar 6, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/46933519, documented in the API reference.