WELL · 42-469-33745 · DISTRICT 2
Buhler #1
Victoria County · Telferner North (3700) field · Directional
Buhler #1 (API 42-469-33745) is a plugged well in Victoria County, plugged September 25, 2008, last operated by Hollimon Oil Corporation.
The RRC has issued 2 drilling permits between 2000 and 2005, permitted to 5,050 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
- Based in
- Castroville, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 5, 2016
- Permits on file
- 262
- Phone
- (210) 829-8822
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hollimon Oil Corporation |
| Production reports | Hollimon Oil Corporationthrough Jan 2006 |
| Latest permit | Hollimon Oil CorporationFeb 22, 2005 |
- 5,050
- total depth, ft
- 2
- permits on file
- Feb 22, 2005
- last permit issued
- Mar 13, 2004
- completed
- 0
- cumulative oil, bbl
- 72.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Sep 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 13, 2004
- Shut in
- —
- Plugged
- Sep 25, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Buhler G-2-209723 | Telferner (2750) | Hollimon Oil Corporation | 1 | 0 | 57.3K | Feb 2005 – Sep 2008 |
| Buhler G-2-202635 | Telferner, North (3700) | Hollimon Oil Corporation | 1 | 0 | 14.7K | Mar 2004 – Feb 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollimon Oil CorporationApr 2004 → Jan 2006
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 557880-99 | Recompletion | Hollimon Oil Corporation | Feb 17, 2005 | Feb 22, 2005 | — | 4,505 |
| 534658-99 | Drill | Hollimon Oil Corporation | Jul 28, 2003 | Aug 4, 2000 | Nov 25, 2003 | 5,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-202635 | — | — | — | — |
| — | — G-2-209723 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 109 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)MIOCENE | 2,600 | -2,491 |
| Frio | 3,960 | -3,851 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,681 | 2,688 | Perforated |
| 4,533 | 4,536 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,187 | 12.25 | 455 S |
| 4.5 | 4,876 | 7.875 | 655 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 14, 2005 | Mar 11, 2005 | Yes |
| 00 | Aug 1, 2005 | — | — |
| 00 | Dec 7, 2004 | Apr 20, 2004 | Yes |
| 00 | Aug 9, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33745 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33745 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933745, documented in the API reference.