TEXAS · WELLS · VICTORIA COUNTY · API 42-469-33792 · DISTRICT 02
Dietze-Carter Gas Unit #1
Victoria County · Mission Valley (8800) field · Vertical
Dietze-Carter Gas Unit #1 (API 42-469-33792) is a plugged well in Victoria County, plugged February 6, 2006, last operated by Rincon Petroleum Corporation.
The RRC has issued 2 drilling permits between 2003 and 2005, permitted to 13,000 ft.
Completion filings report 3 formation tops, including Pettus, Yegua, Wilcox.
Operator of record
- Based in
- Corpus Chrsti, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 18, 2026
- Permits on file
- 259
- Phone
- (361) 883-9896
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rincon Petroleum Corporation |
| Production reports | Rincon Petroleum Corporationthrough Oct 2005 |
| Latest permit | Rincon Petroleum CorporationDec 1, 2005 |
- 13,000
- total depth, ft
- 2
- permits on file
- Dec 1, 2005
- last permit issued
- Jul 30, 2005
- completed
- 0
- cumulative oil, bbl
- 81.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2005 THROUGH Oct 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 30, 2005
- Shut in
- —
- Plugged
- Feb 6, 2006
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Dietze-Carter Gas Unit G-2-217757 | Mission Valley (8800) | Rincon Petroleum Corporation | 1 | 0 | 81.7K | Jul 2005 – May 2006 |
| Dietze Gas Unit G-2-207264 | Wildcat | Rincon Petroleum Corporation | 1 | 0 | 0 | Jan 2004 – Jul 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rincon Petroleum CorporationJul 2005 → Oct 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 610334-99 | Recompletion | Rincon Petroleum Corporation | Dec 1, 2005 | Dec 1, 2005 | — | 12,000 |
| 539407-99 | Drill | Rincon Petroleum Corporation | Dec 8, 2003 | Dec 8, 2003 | Dec 14, 2003 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 30, 2005 | Dietze-Carter Gas Unit G-2-217757 | Mission Valley (8800) | Rincon Petroleum Corporation | Plugged | — |
| — | Dietze Gas Unit G-2-207264 | Wildcat | Rincon Petroleum Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 150 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,962 | 8,972 | Perforated |
| 10,722 | 10,738 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,800 | 12.25 | 525 S |
| 7 | 10,030 | 8.75 | 560 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 13, 2006 | Jan 13, 2006 | Yes |
| 00 | Aug 7, 2006 | — | — |
| 00 | Jun 16, 2005 | Jan 12, 2005 | Yes |
| 00 | Apr 5, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33792 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33792 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933792, documented in the API reference.