WELL · 42-469-33802 · DISTRICT 2
Farris James F. (Shallow) #1
Victoria County · Mission Valley N (Yegua 3270) field · Vertical
Farris James F. (Shallow) #1 (API 42-469-33802) is a plugged well in Victoria County, plugged July 17, 2014, last operated by Chesapeake Operating Inc..
The RRC has issued 2 drilling permits (amended once) between 2004 and 2007, permitted to 4,000 ft.
Completion filings report 2 formation tops, including Catahoula, Frio.
Operator of record
- Based in
- Oklahoma City, OK
- P-5 status
- Delinquent (D)
- P-5 last filed
- Dec 10, 2024
- Permits on file
- 13,061
- Phone
- (405) 935-3100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chesapeake Operating Inc. |
| Production reports | Chesapeake Operating, Inc.through Jan 2009 |
| Latest permit | Chesapeake Operating, Inc.Mar 20, 2007 |
- 4,000
- total depth, ft
- 3
- permits on file
- Mar 20, 2007
- last permit issued
- Jun 1, 2004
- completed
- 0
- cumulative oil, bbl
- 161K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2004 THROUGH Jul 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 1, 2004
- Shut in
- —
- Plugged
- Jul 17, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Farris, James F. (Shallow) G-2-229155 | Eben Haben (1500) | Chesapeake Operating, Inc. | 1 | 0 | 36.1K | Apr 2007 – Jul 2014 |
| Farris, James F. (Shallow) G-2-203422 | Mission Valley, N (Yegua 3270) | Chesapeake Operating, Inc. | 1 | 0 | 125K | Jun 2004 – Apr 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rincon Petroleum CorporationJun 2004 → Mar 2005
- 2Chesapeake Operating, Inc.Apr 2005 → Jan 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 635184-99 | Recompletion | Chesapeake Operating, Inc. | Mar 13, 2007 | Mar 20, 2007 | — | 3,190 |
| 540395-98 | Drill | Rincon Petroleum Corporation | Jun 14, 2004 | Jan 6, 2004 | — | 4,000 |
| 540395-99 | Drill | Rincon Petroleum Corporation | Jan 6, 2004 | Jan 6, 2004 | Dec 21, 2003 | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-203422 | — | — | — | — |
| — | — G-2-229155 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 146 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,468 | 1,478 | Perforated |
| 3,269 | 3,279 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 881 | 12.25 | 335 S |
| 2.875 | 4,000 | 7.875 | 1,055 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 26, 2007 | Aug 17, 2007 | — |
| 00 | Sep 26, 2007 | Aug 1, 2007 | — |
| 00 | Aug 28, 2007 | — | — |
| 00 | Jan 21, 2005 | Jun 14, 2004 | Yes |
| 00 | Sep 24, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-33802 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-33802 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46933802, documented in the API reference.