WELL · 42-469-34049 · DISTRICT 2
Welder/Cliburn #1
Victoria County · Welder Ranch (2000) field · Vertical
Welder/Cliburn #1 (API 42-469-34049) is a plugged well in Victoria County, plugged June 21, 2010, last operated by Rincon Petroleum Corporation.
The RRC has issued 2 drilling permits (amended twice) between 2007 and 2009, permitted to 4,010 ft.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
- Based in
- Corpus Chrsti, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 18, 2026
- Permits on file
- 259
- Phone
- (361) 883-9896
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Rincon Petroleum Corporation |
| Production reports | Rincon Petroleum Corporationthrough Mar 2010 |
| Latest permit | Rincon Petroleum CorporationApr 27, 2009 |
- 4,010
- total depth, ft
- 4
- permits on file
- Apr 27, 2009
- last permit issued
- Nov 9, 2007
- completed
- 0
- cumulative oil, bbl
- 136K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2007 THROUGH Jun 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 9, 2007
- Shut in
- —
- Plugged
- Jun 21, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Welder-Cliburn G-2-249300 | Nursery, S. (1350) | Rincon Petroleum Corporation | 1 | 0 | 38.6K | May 2009 – Jun 2010 |
| Welder/Cliburn G-2-232122 | Welder Ranch (2000) | Rincon Petroleum Corporation | 1 | 0 | 97.9K | Nov 2007 – Apr 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rincon Petroleum CorporationNov 2007 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 680619-99 | Recompletion | Rincon Petroleum Corporation | Apr 22, 2009 | Apr 27, 2009 | Apr 29, 2009 | 4,010 |
| 640822-97 | Drill | Esenjay Operating, Inc. | Nov 20, 2007 | Jun 27, 2007 | — | 4,000 |
| 640822-98 | Drill | Esenjay Operating, Inc. | Oct 30, 2007 | Jun 27, 2007 | Aug 7, 2007 | 4,000 |
| 640822-99 | Drill | Esenjay Operating, Inc. | Jun 15, 2007 | Jun 27, 2007 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-2-232122 | — | — | — | — |
| — | — G-2-249300 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 121 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE OF MIOCENE | 2,150 | -2,029 |
| Frio | 2,800 | -2,679 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,357 | 1,360 | Perforated |
| 2,037 | 2,045 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 789 | 12.25 | 432 S |
| 2.875 | 4,010 | 7.875 | 1,095 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 2009 | May 11, 2009 | Yes |
| 00 | Jul 16, 2009 | — | — |
| 00 | Jan 15, 2008 | Dec 10, 2007 | Yes |
| 00 | Jan 8, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-469-34049 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-469-34049 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/46934049, documented in the API reference.