WELL · 42-473-00121 · DISTRICT 3
Kgfcu 9401(III -A) #9401
Waller County · Katy (Combined) field · Temp Abandoned · Vertical
Kgfcu 9401(Iii -A) #9401 (API 42-473-00121) is a well in Waller County operated by Hilcorp Energy Company, completed May 30, 2013 and listed as temp abandoned on the RRC schedule.
The RRC has issued 2 drilling permits between 1982 and 2013, permitted to 7,502 ft.
Completion filings report 2 formation tops, including Frio, Yegua.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | none |
| Latest permit | Hilcorp Energy CompanyMay 8, 2013 |
- 7,502
- total depth, ft
- 2
- permits on file
- May 8, 2013
- last permit issued
- May 30, 2013
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 30, 2013
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kgfcu 9401(III -A) G-3-271548 | Katy (Combined) | Hilcorp Energy Company | 1 | 0 | 0 | May 2013 – Jul 2026 |
| Kgfcu (IV) G-3-105632 | Katy (Combined) | Hilcorp Energy Company | 1 | 0 | 0 | Jan 1993 – May 2013 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 762135-99 | Recompletion | Hilcorp Energy Company | May 6, 2013 | May 8, 2013 | May 21, 2013 | 7,502 |
| 163391-99 | Recompletion | Exxon Corp. | Jun 11, 1982 | Jun 11, 1982 | — | 7,502 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-105632 | — | — | — | — |
| — | — G-3-271548 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 15 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,754 | 6,790 | Perforated |
| 7,212 | 7,230 | Perforated |
| 7,242 | 7,301 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,538 | 12.25 | 900 S |
| 9.625 | 2,538 | — | — |
| 2.875 | 6,545 | — | — |
| 2.875 | 6,950 | — | — |
| 5.5 | 7,348 | 6.5 | 700 S |
| 5.5 | 7,348 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 8, 2014 | Jun 21, 2013 | — |
| 00 | Jan 12, 1984 | May 26, 1983 | — |
| 00 | Jan 12, 1984 | Feb 10, 1983 | — |
| 00 | Jan 12, 1984 | Aug 4, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-473-00121 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-473-00121 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47300121, documented in the API reference.