WELL · 42-473-30789 · DISTRICT 3

JBG Childrens 1991 Trust B #4

Plugged

Waller County · Brookshire field  · Vertical

Jbg Childrens 1991 Trust B #4 (API 42-473-30789) is a plugged well in Waller County, plugged October 22, 2003, last operated by 84 Energy LLC.

The RRC has issued one drilling permit, issued November 25, 2002, permitted to 4,000 ft.

It was permitted by Lone Wolf Operating Company and has since transferred to 84 Energy LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Gooding, Plunk, Catahoula, Crawford.

Its lease has reported 52.2K barrels of oil and 15.8K mcf of gas since July 2002, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

84 Energy LLC

Permitted by Lone Wolf Operating Company; the EWA schedule now lists a different operator.

Based in
Sugar Land, TX
P-5 status
Active (A)
P-5 last filed
Mar 13, 2026
Permits on file
1
Phone
(832) 398-0917

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedule84 Energy LLC
Production reports84 Energy LLCthrough Aug 2024
Latest permitLone Wolf Operating CompanyNov 25, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Nov 25, 2002
last permit issued
Feb 21, 2003
completed
52.2K
cumulative oil, bbl
15.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2002 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 21, 2003
Shut in
—
Plugged
Oct 22, 2003

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
JBG Childrens 1991 Trust B O-3-24237Brookshire84 Energy LLC452.2K15.8KJul 2002 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 2(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lone Wolf Operating CompanyJul 2002 → Nov 2005
  2. 2Lone Wolf Operating Company, LPDec 2005 → Apr 2009
  3. 3Layline Petroleum I, LLCMay 2009 → May 2013
  4. 4Wapiti Operating, LLCJun 2013 → Mar 2015
  5. 5Clearly Petroleum, LLCApr 2015 → Apr 2020
  6. 6GTG Operating, LLCMay 2020 → Aug 2022
  7. 784 Energy LLCSep 2022 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
525847-99DrillLone Wolf Operating CompanyNov 25, 2002Nov 25, 2002Dec 4, 20024,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-24237————

Formation tops

As filed on W-2/G-1. Subsea from 116 ft elevation.Download CSV →

FormationMD ftSubsea
Gooding1,995-1,879
Plunk2,034-1,918
Catahoula2,321-2,205
Crawford3,208-3,092

Perforations

Perforated and open-hole intervals.

FromToType
2,3702,384Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581212.25310 S
5.53,2107.875440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 9, 2003May 16, 2003Yes
00Jun 4, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47330789, documented in the API reference.