WELL · 42-475-10036 · DISTRICT 8

Edwards C.W. et AL #3

N

Ward County  · Vertical

Edwards C.W. ET AL #3 (API 42-475-10036) is a permitted well in Ward County filed by Chevron U. S. A. Inc.; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1997 and 2015, permitted to 9,400 ft.

Completion filings report 3 formation tops, including Clear Fork, Clfk, Tubb.

Its 4 leases have reported 1.04M barrels of oil and 9.43M mcf of gas since January 1993, last reporting in July 2026. The leases carry 33 wells, so these are lease totals, not this well alone.

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,293
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsPitts Energy Co.through Apr 2026
Latest permitChevron U. S. A. Inc.Jan 9, 2015
9,400
total depth, ft
4
permits on file
Jan 9, 2015
last permit issued
—
completed
1.04M
cumulative oil, bbl
9.43M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 33 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Edwards, C. W., et AL O-10-17577Janelle, SE. (Tubb)Pitts Energy Co.21821K6.35MJan 1993 – Jul 2026
Edwards, C. W. et AL O-10-36309Janelle (Clear Fork)Pitts Energy Co.6142K1.89MMar 2000 – Jul 2026
Edwards, C. W. et AL O-10-21935Janelle (Clear Fork 4900 Ft.)Chevron U. S. A. Inc.347.4K396KJan 1993 – Sep 2000
Edward, C. W. et AL O-10-31912Janelle (Clear Fork)Chevron U. S. A. Inc.328.9K800KJan 1993 – Mar 1999

Gas, mcf lease total

Last 12 months 313,967 · prior 12 88,733(+254%)

020K40K60K202420252026

Oil, barrels lease total

Last 12 months 33,705 · prior 12 21,721(+55%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Mar 2021
  2. 2Pitts Energy Co.Apr 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
802544-99RecompletionChevron U. S. A. Inc.Jan 8, 2015Jan 9, 2015—9,335
472178-99RecompletionChevron U. S. A. Inc.Nov 19, 1997Nov 25, 1997Jun 30, 19979,400
459777-98RecompletionChevron U. S. A. Inc.Aug 4, 1997Mar 12, 1997Aug 4, 19979,400
459777-99RecompletionChevron U. S. A. Inc.Mar 11, 1997Mar 12, 1997—9,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-17577————
—— O-10-21935————
—— O-10-31912————
—— O-10-36309————

Formation tops

As filed on W-2/G-1. Subsea from 2,635 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK 4900 FT.4,847-2,212
Clfk4,847-2,212
Tubb5,086-2,451

Perforations

Perforated and open-hole intervals.

FromToType
4,6064,811Perforated
4,8554,942Perforated
—5,333Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.375915—1,175 S
13.37593117.51,175 S
9.6253,085—2,380 S
9.6253,09912.252,380 S
25,210——
79,323—1,400 S
79,3358.751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 19, 2000Oct 14, 1997—
00Feb 4, 1998Oct 14, 1997—
00Jan 20, 1998——
00Oct 2, 1997Aug 13, 1997Yes
00Sep 23, 1997——
00Jan 12, 1984Aug 21, 1964—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47510036, documented in the API reference.